TMI is requesting Phase I bond release on 175.3 acres in the following parcels as shown in Table I below: <br /> Table I: SL18 Phase I Bond Release Parcels and Associated Acreage <br /> Parcel Area (acres) Parcel Area Parcel Area <br /> AB09 0.3 FA 16 3.7 ZA 15 26.9 <br /> AB 14 2.7 KA16 32.9 ZA16 88.4 <br /> AB 16 18.4 ZA 14 2.0 <br /> Parcels were combined forming one bond release block designated "A, F, K and Z 2009-2016". <br /> Land and Coal Ownership <br /> The ownership of the land for which bond release has been requested is state and private,and the coal ownership <br /> was federal and state. <br /> Summary of Current Activities at Trapper Mine <br /> Trapper Mine is an active mine with two pits where TMI actively mines coal and includes pits approved to <br /> receive flyash(the Ash Pit and the D/E Pit). Reclamation at the Trapper Mine continues as the mining of pits <br /> progresses eastward. On active mine areas,backfilling and grading,topsoil redistribution,and seeding occurs <br /> contemporaneously. <br /> I. SUMMARY OF THE BOND RELEASE PROCESS <br /> History of Previous Bond Release Submittals <br /> The Division approved a full release of reclamation liability for the Craig Generation Plant Loadout in <br /> December 1985. That approval was for release of reclamation liability only. No money was returned; that is, <br /> there was no reduction in the amount of actual bond monies held by the Division. <br /> Other bond release submittals(SL-0 I through SL-18)are summarized in Table II,including a history of liability <br /> reductions requested by TMI. None of the prior bond releases resulted in an immediate change in the amount <br /> of actual bond monies held by the Division,but did lead to changes in monies held during subsequent actions <br /> such as permit renewals. <br /> Permit Number C 1981010 Prepared by: R.Reilley,MS,LISP <br /> SL 18 Page 3 of 22 <br />