Laserfiche WebLink
July 9, 2019 C-1981-041/Roadside Portals CCW <br /> Footprint was vegetated and stable. There were no indications of erosional features. Vegetation on the site was <br /> observed from the spring and early summer moisture,with no irrigation associated with the moisture. The North <br /> Decline consists of a portion of land that is bisected by an access road located at the northern portion of the permit. <br /> The vegetation at the site was established. Vegetation at the site was a mixture of grasses and shrubs. The site <br /> was stable,with the exception of the seeps identified on the western portion of the North Decline. There were <br /> seeps identified above and below Snowcap's permanent diversion ditch on the western part of the North Decline. <br /> A slump had occurred from the seeps above the ditch. All material in the slump was captured by Snowcap's ditch. <br /> Water was observed to be ponding on the flat area below the north decline from the seep identified below <br /> Snowcap's ditch. Monitoring of this site will continue to document if any further movement occurs. Substation A <br /> has been reclaimed for several years. Vegetation at the site was well-established. There were no erosional issues <br /> observed. There were no indications of instability. <br /> Based on the Division's observations,the site remains stable and the conditions of the permit, Rules and the Act <br /> continue to be met by SCC. The surface disturbances observed during this on-the-ground inspection continue to <br /> be as a result of Mr. Fontanari's activities and not those activities associated with SCC,with the exception of the <br /> repair work conducted by SCC in association with SL-11. The repair work conducted by SCC has been re- <br /> disturbed by Mr. Fontanari and will no longer by associated with SL-11 in terms of approval. <br /> With regard to the surface features, erosion, surface cracks observed, and slumps,based on the Division's <br /> observations, these features continue to be a result of the substantial amount of water being directed to the site by <br /> Mr. Fontanari and not as a result of the approved reclamation plan by SCC. No evidence of planting or irrigating a <br /> crop was observed during this inspection. This observation was re-enforced by DWR during the July 9, 2019 <br /> portion of the inspection <br /> DOCUMENTS RECEIVED: None <br /> OTHER(SPECIFY): None <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 11 of 17 <br />