Laserfiche WebLink
Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> July 22,2019 <br /> A48 PHASE 2B SQUAW GULCH GRADING PLAN ISOPACH <br /> A50 OVERALL LINER LIMITS <br /> A60 VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET 1 OF 2 <br /> A62 VALLEY LEACH FACILITY SECTIONS AND DETAILS SHEET 2 OF 2 <br /> A64 UNDERDRAIN DETAIL SHEET <br /> A68 LEAK DETECTION & EROSION CONTROL DETAILS <br /> A70 PHASE 2A HIGH VOLUME SOLUTION CONCENTRATION PIPING LAYOUT <br /> A72 PHASE 213 HIGH VOLUME SOLUTION CONCENTRATION PIPING LAYOUT <br /> A74 HIGH VOLUME SOLUTION COLLECTION SYSTEM DETAILS <br /> RECORD OF CONSTRUCTION DRAWINGS(PRE-2019) <br /> ➢ RECORD DRAWING NO. 1 OF 4 GENERAL COMPOSITE OVERVIEW EAST <br /> ➢ RECORD DRAWING NO. 2 OF 4 GENERAL COMPOSITE OVERVIEW WEST <br /> ➢ RECORD DRAWING NO. 3 OF 4 UNDERDRAIN AS-BUILT <br /> ➢ RECORD DRAWING NO. 4 OF 4 LEAK DETECTION TRENCH AS-BUILT <br /> RECORD OF CONSTRUCTION DRAWINGS (POST 2019) <br /> ➢ RECORD DRAWING NO. 1 OF 6 TOP OF SOIL LINER FILL AS-BUILT <br /> ➢ RECORD DRAWING NO. 2 OF 6 UNDERDRAIN AS-BUILT <br /> ➢ RECORD DRAWING NO. 3 OF 6 HIGH VOLUME SOLUTION COLLECTION SYSTEM <br /> AS-BUILT <br /> ➢ RECORD DRAWING NO. 4 OF 6 LEAK DETECTION TRENCH AS-BUILT <br /> ➢ RECORD DRAWING NO. 5 OF 6 GEOMEMBRANE PANEL LAYOUT AS-BUILT <br /> ➢ RECORD DRAWING NO. 6 OF 6 DRAIN COVER FILL AS-BUILT ISOPACH <br /> LIST OF TABLES <br /> Table 1 Summary of Earthworks Material Specifications <br /> Table 2 Earthworks Testing Summary and Frequency <br /> Table 3 Summary of Weather Data <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\1-REPORTS\ROC Report 1\Cert Report-Phase 2A Part 1\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT.docx <br />