My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-25_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-07-25_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 2:36:07 AM
Creation date
7/29/2019 9:02:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/25/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> FINAL SOIL LINER FILL A38 <br /> SUBGRADE SURFACE <br /> FINAL SOIL LINER FILL FINAL SOIL LINER FILL <br /> - - FINAL SOIL LINER FILL SUBGRADE SURFACE GEOGRID CAP SUBGRADE SURFACE <br /> SUBGRADE SURFACE SEE D AIL FINAL SOIL LINER FILL <br /> STRUCTURAL 11LLrAS'"REQUIRED TO -_ - SUBGRADE SURFACE <br /> ACHIEVE SOIL LINER FILL ELEVATION 15' MAXIMUM SURFICIAL SOILS '_ - - OR <br /> J1r SURFICIAL =- - - <br /> SELECT SOILS <br /> STRUCTURAL <br /> COMPACTED FILL i - <br /> 7' MINIMUM CEMENTED 25' MAXIMUM COMPETENT ; <br /> ROCKFILL 5H:1V MINIMUM BEDROCK AS , <br /> APPROVED BY <br /> CONCRETE ENGINEER 50' MAXIMUM BLASTED CROWN <br /> 3' MINIMUM COMPETENT - PILLAR <br /> PLUG BEDROCK AS <br /> APPROVED BY i PLOWABLE FILL <br /> COARSE ENGINEER INTACT CROWN = DELIVERY BOREHOLE <br /> SHAFT PILLAR <br /> BACKFILL BEDROCK <br /> COMPACTED TOP <br /> LAYER I <br /> 1 SHAFT STOPE REMEDIATION DETAIL ORE INCLINE N MINE LATERAL 5 TYP LOW COMPRESSIBILITY <br /> A38 FLOWABLE FILL <br /> SURFICIAL <br /> SHAFT/STOPE REMEDIATION NOTES: _ - <br /> 1. ROCK SURFACE WITHIN SHAFT SHALL BE SCALED TO REMOVE SURFICIAL <br /> LOOSE MATERIAL PRIOR TO CONCRETE PLUG AND CEMENTED SOILS <br /> ROCKFILL PLACEMENT. SELECT <br /> STRUCTURAL - PRIOR TO REMEDIATION POST REMEDIATION CONFIGURATION <br /> 2. CONTRACTOR TO CONSTRUCT 7' MINIMUM CEMENTED ROCKFILL 25' MAXIMUM FILL <br /> IN EITHER COMPETENT BEDROCK OR SURFICIAL SOILS. 3 OPEN LATERAL REMEDIATION DETAIL <br /> 3. CONTRACTOR TO EXCAVATE PREVIOUSLY COLLAPSED A38 <br /> SHAFTS/STOPES TO APPROXIMATELY 25' BELOW FINAL SOIL <br /> LINE FILL SUBGRADE SURFACE. <br /> 4. COMPACTION OF TOP LAYER OF COARSE SHAFT BACKFILL TO INTACT <br /> BE METHOD SPECIFICATION APPROVED BY THE ENGINEER. BEDROCK <br /> EXISTING GROUND SURFACE OR SOIL LINER FILL <br /> SHALLOW SHAFT REMEDIATION DETAIL SUBGRADE SURFACE - WHICHEVER IS LOWER <br /> 2 R <br /> A38 FIRST LAYER OF UX1700HS OR EQUIVALENT <br /> GEOGRID (INSTALLED APPROXAMATELY 6" MINIMUM SELECT STRUCTURAL FILL <br /> SHALLOW SHAFT REMEDIATION NOTES: PARALLEL TO SLOPE DIRECTION) <br /> 1. COMPACT SELECT STRUCTURAL FILL USING METHOD SPECIFICATION 6" MINIMUM SELECT STRUCTURAL FlLL <br /> APPROVED BY THE ENGINEER. FIRST LAYER OF UX1700HS OR EQUIVALENT <br /> a GEOGRID (INSTALLED APPROXAMATELY 6' MINIMUM SELECT STRUCTURAL FILL <br /> 2. SELECT STRUCTURAL FILL MAY BE REPLACED WITH STRUCTRUAL FILL PARALLEL TO SLOPE DIRECTION) <br /> PER THE PROJECT SPECIFICATIONS. <br /> N-COMPACTED FOUNDATION MATERIAL <br /> m <br /> i <br /> 5 5 GEOGRID CAP INSTALLATION DETAIL TYP. <br /> A38 FINAL SOIL LINER FILL SUBGRADE A38 <br /> o SURFACE OR EXISTING GROUND <br /> ---SURFACE WHICHEVER IS LOWER <br /> _ _________- - __ GEOGRID CAP INSTALLATION NOTES: <br /> ---- <br /> o - i 1. CONTRACTOR TO INSTALL DIRECTION OF MAXIMUM STRENGTH FOR THE <br /> - - <br /> SECOND LAYER OF UX1700HS OR EQUIVALENT HS GEOGRID TRANSVERSE TO <br /> -- <br /> 3 THE DIRECTION OF MAXIMUM STRENGTH FOR THE FIRST LAYER OF <br /> o \\/ UX1700HS GEOGRID. �G�r <br /> .......2. A THIRD GEOGRID LAYER MAY BE ADDED IN AREAS UNDER HIGH NORMAL <br /> i LOAD. AREAS REQUIRING THIRD GEOGRID WILL BE DETERMIN31) DURING •j:��'• <br /> REMEDIATION. `7�•• <br /> COARSE SHAFT BACKFILL OR STRUCTURAL a� <br /> FILL DEPENDING ON SLOT SIZE (BY 3. GEOGRID CAP TO EXTEND MINIMUM 15 FEET BEYOND MINE WORKING LIMIT. •� T O' <br /> ENGINEER) <br /> APPROVED BY: DISCLAIMER CRIPPLE CLIENT CRIPPLE CREEK & VICTOR <br /> 0 2' TO 3' TYPICAL JNM NEWFIELDS PRODUCED THE INFORMATION PRESENTED .N ewFields GOLD MINING COMPANY <br /> (NOT TO EXCEED 4') CHECKED BY: ON THIS DRAWING THROUGH THE USE OF AVAILABLE PROJECT <br /> jJNM TECHNIECEMNG THSORMATION AND DRAWI G DOES D�NOTIGUCARANTEE ANY SQUAW GULCH VLF PHASE 2 <br /> 4 OPEN MINED SLOT REMEDIATION DETAIL DESIGNED By, RIGHTS TO EITHER SUCH TECHNICAL INFORMATION OR <br /> JHp EXPERIENCE. ANY MODIFICATION OR ADAPTATION OF TITLE FILENAME <br /> .o A38 THE DATA OR DRAWING SHALL BE AT USER'S RISK UNDERGROUND WORKING REMEDIATION 0106.027,016D <br /> / 0 -12-201 L53UED FOR CLIENT REVIEW 7HP ]NY DRAWN BY: AND WITHOUT ANY LIABILITY OR LEGAL DRAWING NO. REVISION <br /> a REV DATE DESCRIPTION TECH ENG JHP RESPONSIBILITY TO NEWFIELDS. TYPICAL DETAILS A38 O <br />
The URL can be used to link to this page
Your browser does not support the video tag.