My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-25_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-07-25_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 2:36:07 AM
Creation date
7/29/2019 9:02:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
7/25/2019
Doc Name
Request for Technical Revision
From
CC&V
To
DRMS
Type & Sequence
TR117
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek&Victor Gold Mining Company ■ <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> July 22,2019 <br /> 3.2.5. Leak Detection Fill <br /> The Squaw Gulch VLF Phase 2A Part 1 area was constructed by placing 111 cy of leak <br /> detection fill (LDF). The particle size distribution and Atterberg limits testing frequencies <br /> were one sample for every 10,000 cy. One LDF sample was required to be tested for <br /> particle size and Atterberg limits. One LDF samples was tested with passing results. LDF <br /> laboratory testing is summarized in Table 9 and individual test results are presented in <br /> Appendix 1.5. <br /> 3.2.6. Soil Liner Fill <br /> The Squaw Gulch VLF Phase 2A Part 1 area was constructed by placing 24,670 cy of soil <br /> liner fill (SLF). The particle size distribution, Atterberg limits, laboratory compaction, and <br /> permeability testing frequencies were one sample for every 4,000 cy. Seven SLF record <br /> samples were required to be tested for particle size distribution, Atterberg limits, <br /> laboratory compaction, and permeability testing. Ten SLF record samples were tested <br /> with passing results. SLF laboratory testing is summarized in Table 10 and individual test <br /> results are presented in Appendix 1.6. <br /> The nuclear density/moisture testing frequency for SLF is one test for every 500 cy. A <br /> minimum of 50 SLF nuclear density/moisture tests were required. A total of 54 SLF <br /> nuclear density/moisture tests were performed with passing results. The depth check <br /> frequency for SLF is two checks for every acre. A minimum of 31 SLF depth checks were <br /> required. A total of 32 SLF depth checks were performed with passing results. SLF <br /> nuclear density/moisture testing and SLF depth checks are presented in Tables 12 and <br /> 13 respectively. <br /> 3.2.7. Drain Cover Fill <br /> The Squaw Gulch VLF Phase 2A Part 1 area was constructed by placing 49,339 cy of drain <br /> cover fill (DCF). The particle size distribution and Atterberg limits testing frequencies <br /> were one sample for every 20,000 cy. Three DCF samples were required to be tested for <br /> particle size and Atterberg limits. Six DCF samples were tested with passing results. DCF <br /> laboratory testing is summarized in Table 11 and individual test results are presented in <br /> Appendix 1.7. <br /> 3.3. Concrete and Cemented Rockfill Quality Assurance <br /> The CQA Monitor observed the placement of all concrete and cemented rockfill used to <br /> remediate the Squaw Gulch VLF Phase 2 underground workings. A total of 2,621 cy of concrete <br /> was used during remediation. The concrete was tested for slump, temperature, and <br /> compressive strength at a rate of one test per 50 cy. A minimum of 52 samples were required <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\J-REPORTS\ROC Report 1\Cert Report-Phase 2A Part 1\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT.docx <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.