Cripple Creek&Victor Gold Mining Company <br /> Squaw Gulch VLF Phase 2A Part 1 ■ <br /> Record of Construction Report <br /> 475.0106.032 <br /> July 22,2019 <br /> slope existed, two smooth drum compactors mounted in tandem with a dozer were used to <br /> compact the subgrade. The contractor also utilized a smooth drum compactor attachment <br /> mounted on an excavator on slopes where the two compactors and dozer configuration could <br /> not be used. Compaction of the subgrade was performed in accordance with the applicable <br /> developed method specifications, presented in Appendix E, for the following equipment: <br /> ➢ Vibratory smooth drum compactor; <br /> ➢ Excavator smooth drum roller attachment; and <br /> ➢ Vibratory sheepsfoot drum compactor. <br /> The CQA Monitor inspected and approved the finished subgrade surface prior to SLF <br /> placement. <br /> 2.6. Leak Detection Trench <br /> Approximately 2,995 linear feet of leak detection trench was constructed within the Squaw <br /> Gulch VLF Phase 2A limits in accordance with the project Technical Specifications. The Phase 2A <br /> leak detection trench has only been partially constructed, as shown on Record Drawing No. 4. <br /> The leak detection trenches installed prior to March 2019 have been inspected and repaired, as <br /> needed, prior to the acceptance of the subgrade. The remainder of the leak detection trench to <br /> be constructed, as well as the leak detection sumps, will be completed during future <br /> construction. <br /> Detail N on IFC Drawing A68 shows the typical leak detection trench section. Per Detail N, a <br /> minimum one foot by one foot trench was excavated and lined with 40 mil smooth LLDPE <br /> geomembrane. The geomembrane was installed in long strips with a 5-foot overlap and was <br /> overlain by a 12 oz/ydZ non-woven geotextile. A 4-inch diameter perforated corrugated <br /> polyethylene pipe (CPeP) was then placed in the trench. The trench was backfilled with Leak <br /> Detection Fill (LDF) and the geotextile was wrapped around the fill with a minimum 1-foot <br /> overlap. A minimum slope of 0.5 percent was maintained along the entire length of the trench. <br /> Where necessary, portions of the leak detection trench (constructed prior to March, 2019), <br /> geotextile was replaced within it. The CQA Monitor observed all leak detection trench <br /> installation to date. <br /> The Squaw Gulch VLF Phase 2A leak detection trench was constructed by installing <br /> approximately 14,975 square feet of 40 mil smooth LLDPE geomembrane, 14,975 square feet of <br /> 12 oz/ydZ non-woven geotextile, 2,995 linear feet of 4-inch CPeP and 111 cy of LDF. <br /> P:\Projects\0106.032 VLF2 Phase 2 CQA\J-REPORTS\ROC Report 1\Cert Report-Phase 2A Part 1\475.0106.032 CCV PHASE 2A Part 1 <br /> ROC REPORT.docx <br /> Page 6 <br />