Laserfiche WebLink
Truck Travel(Haul&Return)Time: Road Condition: Firm, smooth,rolling,dirt/It. surfaced,watered <br /> maintained 3.0 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 5144.00 3.00 3.00 6.00 1266 4.238 <br /> Haul Time: 4.238 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll. Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 5144.00 -3.00 3.00 0.00 3503 1.672 <br /> Return Time: 1.672 minutes <br /> Total Truck Cycle Time: 9.369 minutes <br /> Loading Tool unit <br /> Production 4,645.04 LCY/Hour Adjusted for job efficiency: 3,855.38 LCY/Hour <br /> Truck Unit Production <br /> 1,120.05 LCY/Hour Adjusted for job efficiency: 929.65 LCY/Hour <br /> Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: 4 Truck(s) <br /> Adjusted hourly truck team production: 3,718.58 LCY/Hour <br /> Adjusted single truck/loader team production: 3,718.58 LCY/Hour <br /> Adjusted multiple truck/loader team production: 3,718.58 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 30.62 Hours <br /> Unit cost: $1.222 /LCY Total job cost: $1399144 <br />