Laserfiche WebLink
COST SUMMARY WORK <br /> Task description: Haul and Regrade Collom Topsoil <br /> Site: Colowyo Coal Mine Permit Action: MR205 Permit/Job#: C 1981019 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 7/18/2019 County: Moffat Filename: CO19-000 <br /> User: ZTT <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Load,Haul and Regrade Collom Topsoil TRUCKI 1 30.68 $1391447 <br /> 002 Reseed Temporary Spoil Pile REVEGE 1 33.00 $181888 <br /> SUBTOTALS: 63.68 $158,335 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $3,198 <br /> Performance bond: 1.05 Total= $103 <br /> Job superintendent: 31.84 Total= $2,209 <br /> Profit: 10.00 Total= $15,834 <br /> TOTAL O&P= $221904 <br /> CONTRACT AMOUNT(direct+O&P)= $181,23 9 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $0 Total= $0 <br /> Engineering work and/or contract/bid preparation: 2.00 Total= $3,625 <br /> Reclamation management and/or administration: 1.91 $3,462 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $291990 <br /> TOTAL BOND AMOUNT(direct+indirect)= $188,325 <br />