Laserfiche WebLink
the end of this section. There is no pending litigation regarding either surface or <br /> mineral ownership. Exhibit 1-6 provides the Permit Area Legal Description. <br /> 2.03.7 Relationship to Areas Designated Unsuitable for Mining <br /> 2.03.7(l)Unsuitable Designation Status. An environmental impact assessment prepared <br /> by Bureau of Land Management (BLM) stated that the twenty criteria contained in <br /> 40CFR3460, published in the Federal Register July 19, 1979, would be addressed by <br /> OSM and CMLRD (now DMG) in the Technical Environmental Assessment. OSM or <br /> CMLRD did not designate any area unsuitable for mining within the permit area. <br /> 2.03.7(2) Not Applicable <br /> 2.03.7(3) Not Applicable <br /> 2.03.8 Permit Term Information <br /> The starting date for the construction activities to begin development of the mine <br /> was July, 1981. Coal shipment began in the first quarter of 1984. As of 2019, the <br /> mine has enough coal reserves to last for about 16 years at the current rate of <br /> mining. More detailed information is given in Section III, Mine Description and <br /> Section IV, Mine Surface Facilities Operation Plan. <br /> 2.03.9 Personal Injury and Property Damage Insurance Information <br /> The information is included as Exhibit 1-4 <br /> 2.03.10 Identification of Other Licenses and Permits <br /> A list of current licenses and permits by type, name and address of issuing authority, <br /> identification number and approval date is given below; <br /> (1) Air Emission Permit <br /> No.12RB802-1 F issued on April 15, 1998 (Emergency Stockpile) <br /> No. 12RB802-2 issued on June 25, 2009 (D-Portal Area) <br /> No. 12RB803-3F issued on December 29, 2003 (Refuse Haul Road) <br /> No. 12RB802-5 issued on December 29, 2003 (Overland Conveyor) <br /> Permit Renewal #7— RN-7 (01/2019) 1-8 <br />