Laserfiche WebLink
Geosyntec " <br /> consultants nts Page 12 of 12 <br /> Client: Arcosa LWB Project: Permit Amendment Project No.: DE0374 Task: Exhibit S—Structures Evaluation <br /> Written by: Jonathan Gillen Date: 7/8/2019 Reviewed by: Youngmin Cho Date: 7/9/2019 <br /> Approved by: Poppy Staub Date: 7/15/2019 <br /> REFERENCES <br /> Das,B.M., (2006) "Principles of Geotechnical Engineering"6'Ed.,Thompson Canada Ltd., <br /> Ontario. <br /> Dobson et al., (2013)Inventory of Shale Formations in the US Including Geologic, <br /> Hydrological, and Mechanical Characteristics. Fuel Cycle Research &Development. U.S. <br /> Department of Energy Used Fuel Disposition. FCRD-UFD-2014-000513. November 2013. <br /> DRMS. (2018). Policies of The Mined Land Reclamation Board. Chapter 30.0. Colorado <br /> Department of Natural Resources, Division of Reclamation, Mining and Safety. 16 May 2018. <br /> Kramer, S.L., (1996) "Geotechnical Earthquake Engineering". University of Washington. <br /> Prentice-Hall. Upper Saddle River, New Jersey 07458. <br /> Sabatini et al. (2002)Evaluation of Soil and Rock Properties. Geotechnical Engineering Circular <br /> No. 5. Federal Highway Administration. Report No. FHWA-IF-02-034. April 2002. <br /> Sergent et al., (1992). Engineering Design and Operations Report. Certificate of Designation <br /> Shale Mine Ash Backfill Project. Sergent, Hauskins & Beckwith for Western Aggregates, Inc. <br /> 11728 Highway 93, Boulder, CO 80303. March 1992. <br /> SLIDE 7.0 User's Guide, (2018) "213 Limit Equilibrium Slope Stability for Soil and Rock Slopes" <br /> 1998-2018, Rocscience Inc. <br /> Spencer, E., (1973)"The Thrust Line Criterion in Embankment Stability Analysis"Geotechnique, <br /> Vol. 23, No. 1, pp. 85-100. <br /> United States Army Corps of Engineers, (2003)Slope Stability Engineer Manual, EM 1110-2- <br /> 1902, pp. 205 <br /> Structures Evaluation <br /> Arcosa LWB Plan—Permit Amendment 2019-07-16 <br />