Laserfiche WebLink
mining limits are adhered to. <br /> (3) The Office may approve an alternative plan for identifying the boundaries of <br /> the affected land if the Operator includes such a plan in the permit application: <br /> Please see Section 3.1.12(2) above. <br /> 36 <br />