Laserfiche WebLink
Operation: COAL CREEK RESOURCES <br /> Permit: M-1988-044 <br /> Lease: GL264-5th Amendment <br /> Operator: Schmidt Construction Company <br /> Entrance Land Owner: State of Colorado <br /> Quincy Avenue Range 65 West Range 64 West <br /> 12 <br /> S8°° <br /> Vital Statistics <br /> New Lease Area: 780 acres <br /> New Permit Area: 715 acres <br /> s: r (see report narrative for details) <br /> 5 <br /> ��-- ' _ -------- - New Lease Boundary <br /> New Permit Boundary <br /> Land reclaimed and <br /> w released from Reclamation <br /> Bond <br /> 32 acres reclaimed. To be <br /> `Y released after statutory <br /> ,._ 11112 ,2 7 wait time (usually about <br /> 14 1.-d <br /> - - -- -------- - 73,s- 30 days) <br /> 5900 <br /> ` Final disturbance land; <br /> being reclaimed; mining has <br /> o • ceased. <br /> o • <br /> ' Topsoil stockpile(s) <br /> � h <br /> -r7 E Backfilling, Shaping, Grading, <br /> r - Drainage Establishment; and <br /> other Reclamation activities. <br /> ess ad <br /> J <br /> U onoco/Philli <br /> \ - Final grading and prep for <br /> well pad and a revegetation <br /> O 1 wel <br /> U, t Final Grading <br /> 8acktill and <br /> Shaping <br /> Slopes <br /> 14 Paond < - <br /> 26 24P ^ - - - <br /> Topsoil , <br /> • t ' G� nA Stockpile �^° O• ^ � <br /> d7 0 7 °Well <br /> Jt <br /> r <br /> ----- -----------_ <br /> 00 <br /> ' o <br /> • s1P 0 <br /> t <br /> ---------- Tributary streams <br /> Summary of 2018/2019 Operating Year <br /> . . ' - Coal Creek <br /> stream channel <br /> 1. After a wet winter and spring, the reclamation was in excellent <br /> condition. On July 3, 2019, DRMS inspected the reclamation and has Main on-site roads <br /> determined it is reclaimed. It will be released, leaving only the final <br /> mining and processing area to reclaim. Good grazing management is Minor on-site roads <br /> evident. <br /> 2. Cheat grass is very heavy everywhere this year due to wetness of 2019 Operation Status Map <br /> winter and spring. Other weeds on mined land are sparse. ,T T,a Magnetic Report Map Revised as of: <br /> 'ANorin)t a.t E) July 3,2019 <br /> 3. Mining ceased in November 2018. Since then disassembly and �\ <br /> 0 500 1000 1500 2000 <br /> reclamation has been done. By MAH base date Nov.05 <br /> This map prepared by MAH: <br /> July 2019 <br /> 1" = 1,200' <br />