Laserfiche WebLink
Panoramics 10 and 11 <br /> Northeast East <br /> - , via <br /> -� - <br /> Pan 10: (3 images combined) Pan 10 and 11 combined show the entire east side of the pit from north (left) to south (right). <br /> Downhill is to the left. <br /> East slope after cut and/or fill <br /> Southeast <br /> - <br /> 71 Tz "'O." <br /> t - <br /> 74RS .. <br /> 45 <br /> _. . Ac AMr' •p.,: - -�i�t� •> y 's+'r ..+''f�Y��.'t>- '.. �iFir.:R: :..'c - �•! ..+"y '!''�^�,• `"` <br /> Pan 11: (3 images combined) Here is the south end of the pit which requires the most work to finish. The blue lines are conceptual <br /> drainages that lead to the main drainage in Pan 10. At the end, no highwalls will remain on the south end. They will be eliminated with <br /> either backfilling or a combination of backfilling and pushing material beyond the highwall to create a final slope. Same applies to the <br /> "crater" near the left end of the image. <br />