Laserfiche WebLink
9 May 2019 C-1981-010/Trapper Mine RAR <br /> respectively,with a Bad Elf GNSS instrument and associated Ipad and software applications. 25 points <br /> were collected in parcel LA18 the area of interest comprising 57.6 acres, and are shown in Map 2 below. <br /> The data associated with these points is presented at the end of this report in Table 1: Measured Field <br /> Elevations. <br /> If <br /> m <br /> a <br /> T; An m4,° <br /> r a LJ p P. q Wry ; <br /> . <br /> m 'W <br /> P , <br /> m' <br /> P I. .. <br /> —,`° <br /> ^� 1 <br /> ' r y <br /> F9 4% m <br /> a° <br /> ar <br /> ° r <br /> 1 <br /> 1 <br /> 1 <br /> _t; i 4 1 <br /> Map I: Overview of Trapper Mine and Field Collected Elevations showing Trapper's permit extent, hydrogaphy <br /> and field elevation points (orange circles). <br /> A total of 25 points were collected along three transects and down three drainage profiles in parcel LA18 <br /> including two benchmark measurements. The three constructed drainages (MF IN,MF3' and MF2'),trend <br /> downslop to the north from the east to the west of the parcel respectively. Transect#1 traverses the slope <br /> from east to southwest approximating the 7550 contour. Transect#2 traverses the north facing slope and <br /> trends downhill from east to west. Transect#3 trends north to northwest down the slope at the east edge <br /> of the parcel. Points comprising the analysis are provided in Table 1 at the end of this report. <br /> o Backfilling and grading operations appeared to be progressing as permitted. <br /> o Dumping of spoil is taking place in benches and was not being graded at the time of <br /> inspection. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 3 <br />