Laserfiche WebLink
ARR-2 rl <br /> The Division received proof of notice for the following companies, however, the structures or <br /> easements owned by the companies are not listed on the Exhibit E-1:Mining Plan Map. Please <br /> update the Exhibit E-I map or explain the discrepancies accordingly. <br /> • United Power <br /> • Rocky Mountain Midstream <br /> • Waste Management <br /> • Qwest Communication DBA CenturyLink QC <br /> • Colorado Interstate Gas <br /> • Kerr-McGee Gathering LLC <br /> The Division did not receive proof of notice for the following owners of record of all land surface <br /> within 200 feet of the boundary of the affected land including all easement holders located on <br /> the affected land and within 200 feet of the boundary of the affected land. Please provide proof <br /> of notice pursuant with Rule 1.6.2(1)(t) or explain the discrepancy accordingly. <br /> • Mountain Bell Co. <br /> • Associated Natural Gas <br /> • Front Range Gas <br /> • Weld County Commissioners <br /> • Industrial Gas Service, Inc. <br /> • Adolph Coors Company <br /> • Panhandle Eastern Pipe Line Co. <br /> • CP-Boots <br /> • Waste Services Company <br /> CSC Response: <br /> The discrepancies between the above-listed (first group) entities and labeling of the respective <br /> landowners and/or holders of easements on Exhibit E-l: Mine Plan Map are duly noted. CSC <br /> therefore provides(attached hereto) a revised Exhibit E-1: Mine Plan Map appropriately depicting <br /> the following entities and/or features. <br /> United Power(Reception No. 4492719). Schedio Group has been in communication with United <br /> Power regarding their electrical power transmission line project from the onset of the Keenesburg <br /> Project to ensure proper coordination between the two projects. The United Power electrical power <br /> transmission line has been constructed, and the associated easement, as depicted on Exhibit E-1, <br /> has been recorded. <br /> Rocky Mountain Midstream. Schedio Group has been in communication with Rocky Mountain <br /> Midstream regarding their liquified natural gas pipeline project from the onset to ensure proper <br /> coordination between the two projects. The Rocky Mountain Midstream liquified natural gas <br /> pipeline has not yet been constructed and therefore is not depicted on Exhibit E-1. As timing <br />