Laserfiche WebLink
-6 - <br /> 2. The Board may suspend or revoke this permit, or assess a civil penalty. upon a finding that the permittee <br /> violated the terms or conditions of this permit. the Act, the Mineral Rules and Regulations, or that information <br /> contained in the application or your permit misrepresent important material facts; <br /> 3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit <br /> boundary, substantial civil penalties, to you as permittee can result; <br /> 4. Any modification to the approved mining and reclamation plan from those described in your approved <br /> application requires you to submit a permit modification and obtain approval from the Board or Office; <br /> 5. It is your responsibility to notify the Office of any changes in your address or phone number; <br /> 6. Upon pennit issuance and prior to beginning on-site mining activity,you must post a sign at the entrance of <br /> the mine site. Which shall be clearly visible from the access road. With the following information (Rule 3.1.12): <br /> a. the name of the operator: <br /> b. a statement that a reclamation permit for the operation has been issued b) the Colorado Mined Land <br /> Reclamation Board; and. <br /> C. the permit number. <br /> 7. The boundaries of the permit boundary area must be marked b) monuments or other markers that are clearly <br /> \,isible and adequate to delineate such boundaries prior to site disturbance. <br /> 8. It is a provision of this permit that the operations will be conducted in accordance With the terms and <br /> conditions listed in your application,as Well as Nvith the provisions of the Act and the Construction Material Rules <br /> and Regulations in effect at the time the permit is issued. <br /> 9. Annually.on the annik ersan, date of permit issuance.you must submit an annual fee as specified by Statute, <br /> and an annual report which includes a map describing the acreage affected and the acreage reclaimed to date (if <br /> there are changes from the pre,,ious )ear). am monitoring required by the Reclamation Plan to be submitted <br /> annually on the anniversary date of the permit approval. Annual fees are for the previous year a permit is held. For <br /> example.a permit W ith the anniversary date ofJUIN 1. 1995.the annual fee is for the period of Jul) 1. 1994 through <br /> June 30. 1995. Failure to submit your annual fee and report b) the permit anniversary date ma-, result in a civil <br /> penalty, re%ocation of)our permit, and forfeiture of your financial Warranty. It is )our responsibility. as the <br /> permittee.to continue to pay y our annual fee to the Office until the Board releases)ou from y our total reclamation <br /> responsibilit\. <br /> 10. For joint \enture'partnership operators:the signing representati�e is authorized to sign this document and a <br /> polder of attorney (provided b\ the partner(s)) authorizing the signature of the representative is attached to this <br /> application. <br />