Laserfiche WebLink
All other information required under 4.10.1 has been met. <br /> 4.10.2—Site Inspection <br /> Inspections of waste banks shall be conducted as per this Rule.No additional information <br /> is required. <br /> 4.10.3—Water Control Measures <br /> • 4.10.3(5) <br /> Please see comment under 4.09.2(2)(d). <br /> All other information required under 4.10.3 has been met. <br /> 4.10.4—Construction Requirements <br /> All information required under 4.10.4 has been met. <br /> 4.11—Coal Mine Waste <br /> Rule 4.11 is not applicable to the information proposed under TR-27. <br /> Other <br /> • The cover pages for Appendices 10 (see GCC Response#4)have been corrected <br /> and provided.No additional comment. <br /> • GCC has provided an explanation regarding Page 1 of the Report's reference to <br /> DMG and is logical (see GCC Response#5).No additional comment. <br /> • Page 1 of the Report's reference to Rules 2.05.3(8) and 2.05.3(9)has been <br /> corrected(see GCC Response#5).No additional comment. <br /> This concludes my review of King's TR-27. If you have any questions, feel free <br /> to contact me. <br /> Sincerely, <br /> Zach Trujillo <br /> 3 <br />