Laserfiche WebLink
TUCSON SOUTH PROPOSED GRAVEL MINE STABILITY ANALYSIS <br /> SLOPE STABILITY ANALYSIS - PIPELINE (EAST SIDE OF EAST CELL) <br /> TETRA TECH <br /> (Pcf) (PSO (0) <br /> TaO (Cpleayk <br /> tone Bedrock Mohr-Coulomb 134 100 28 <br /> strength) <br /> . Overburden Mohr-Coulomb 126 50 28 <br /> . Reclamation Slope Fill Mohr-Coulomb 126 25 26 <br /> Sand and Gravel Mohr-Coulomb 137 0 35 <br /> ■ Slurry Wall Mohr-Coulomb 122 0 0 <br /> ■ Weathered Claystone Mohr-Coulomb 134 0 14 <br /> Bedrock(residual <br /> strength) <br /> 1.4 218 ft No- <br /> Todd Creek Pipeline <br /> 2.25 with 20'easement <br /> 4 42 ft--Doi23 19 Waine Platte River <br /> 4,967 <br /> 4,957 _ <br /> 4.947 i <br /> 4,937 <br /> } 4.927 <br /> 4.917 <br /> CM <br /> 4,907 <br /> = 4.897 <br /> 4,887 <br /> 4,877 <br /> 4,867 <br /> -40 -20 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 <br /> Distance (ft) <br /> Figure M-1- Static Analysis <br />