My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-01_REPORT - C1981019
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981019
>
2019-07-01_REPORT - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 10:59:18 AM
Creation date
7/2/2019 9:03:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
7/1/2019
Doc Name
Quarterly Fill Inspection Report
From
Tri-State Generation and Transmission Association, Inc.
To
DRMS
Annual Report Year
2019
Report Quarter_Month
2
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT` ~ SOUTH TAYLOR FILL <br /> (Including Both the East Taylor and West Taylor Fill Segments) <br /> INDICATE QUARTER 1ST11 2 ND X 3RD 13 4TH 2019 <br /> YEAR <br /> ALL QUARTERS NEED TO BE CERTIFIED* <br /> THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br /> 1 Has any significant change been noted in the survey monuments on the fill? <br /> No NA Yes <br /> If yes, explain: <br /> Date of Survey: NA <br /> Reviewed By: Brian Coates <br /> 2) Has any significant change been noted in the water level found in the fill monitoring <br /> well? <br /> No X Yes Measured Level 201.2 feet If yes, explain: <br /> Date of Measurement: 6-4-19 <br /> Measured By: Brian Coates <br /> 3) Has there been any evidence of surficial slope failure on the face of the fill? <br /> No X Yes <br /> If yes, explain: <br /> Date of P.E. Inspection: 6-4-19 <br /> Inspected By: Brian Coates <br /> 4) Has there been any formation of springs or seeps on the face of the fill? <br /> No X Yes <br /> If yes, explain.- <br /> Date of Inspection: 6-4-19 <br /> Inspected By: Brian Coates <br /> L <br /> Olt <br /> ***off 00004 <br /> I am a Registered Professional Engineer in the State of Colorado. Being farnIller with the Colowyo operation,and relying on the <br /> information provided to me by Colowyo Personnel,the West and East Taylor Fill are observed to be stable,at the time of inspection. <br /> Construction activities related to the West and East Taylor Fill are in conformance,to the best of my knowledge and experience,as <br /> specified in the Introductory pages and the associated report found In Volume 13,Exhibit 21,Item 1,and other applicable <br /> requirements of the approved permit documents,a portion of CDRMS Permit C-1981-019. <br />
The URL can be used to link to this page
Your browser does not support the video tag.