My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-01_REVISION - C1981035
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2019-07-01_REVISION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 7:15:47 AM
Creation date
7/2/2019 7:07:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
7/1/2019
Doc Name
Adequacy Review
From
GCC Energy, LLC
To
DRMS
Type & Sequence
TR27
Email Name
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GCCGCC Energy, LLC <br /> Telephone.970.385.4528 6473 County Road 120 <br /> Energy "Safety as a Value" Facsimile: 970.385 4638 Hesperus, CO 81326 <br /> June 25, 2019 <br /> State of Colorado <br /> Division of Reclamation, Mining 8a Safety R �'!71VED <br /> 1313 Sherman St., Room 215 <br /> Denver, CO 80203 �IU�_ 1 2019 <br /> Attn: Rob Zuber, Environmental Protection Specialist II (N"RECLAMATION <br /> MIN14 AND SAFETY <br /> Re: GCC Energy, LLC, King 11 Mine <br /> CDRMS Permit # C-1981-035 <br /> Technical Revision No. 27 (TR-27) <br /> 0 Reconfigure Parts of the Existing, Permitted Refuse Pile <br /> Preliminary Adequacy Review 1 Response <br /> Mr. Zuber: <br /> In repsonse to your letter of May 3, 2019, please find responses below to each item of <br /> concern (shown in italics) as listed in your letter. GCC Energy responses are show in <br /> bold text. <br /> Section 2.05 <br /> 1. Per Rule 2.05.3(8), please update Section 2.05.3 to include a discussion regarding the <br /> lower refuse pile expansion proposed under TR-27. Per the rule, this section should <br /> explain the construction, modification, use, maintenance, removal, and reclamation of coal <br /> processing and non-coal waste removal, handling, storage, transportation and disposal <br /> areas and structures in the permit area. Note that in the currently approved PAP, this <br /> discussion is provided in Section 2.05.3. <br /> GCCE June 25,2019: In an email exchange with Rob Zuber on May 8, 2019, it was <br /> determined that the DRMS engineer reviewing this section had not seen Section <br /> 2.05.3 page 2A as supplied in the original TR-27 submittal. The page, as originally <br /> submitted was determined to be sufficient. <br /> 2. Section 2.05.4 includes a discussion of fill material (aka, sub-soil). Has GCC performed <br /> volume calculations for this material? This is necessary for the Division to produce an <br /> accurate Reclamation Cost Estimate. <br /> GCCE June 25,2019: Volume calculations for fill material and plant growth medium <br /> have been added to revised section 2.05.4 page 11. <br /> 3. Section 2.05.6 needs to be updated to reflect any changes with Appendix 11. <br /> GCCE June 25,2019: Section 2.05.6 page 1 has been revised to reflect changes to Appendix 11 <br /> and the associated maps. <br />
The URL can be used to link to this page
Your browser does not support the video tag.