Laserfiche WebLink
Homestake Mining Company June 17 2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> Project Name: Pitch Mine Reclamation Project-Reclamation Plan <br /> Date of Submittal: March 1,2019 <br /> File Name: SRCE_Version_1_4 1 016c_2019-06-06_amh_User 3 Updates.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data-USR_1_12_2019-05-14.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada <br /> Reclamation Monitoring 8 Maintenance-Cost Summary <br /> Labor J Equipment Materials Totals <br /> Revegetation Maintenance $0 $0 $0 $0 Clear Sheet <br /> Erosion Maintenance $0 $0 WA $0 <br /> Reclamation Monitoring <br /> $0 $0 N/A $0 <br /> Subtotal Reclamation MonRonn 0 0 0 $5 <br /> Water Quality Monitoring sol 50 $0 $0 <br /> TOTAL MONITORING Sol $0 so SO <br /> Reclamation Maintenance <br /> Tmal A— Area <br /> Reveyetanon Requue,g RegWYg <br /> �es�ripnon Surlace Area 0,3) Rrseeuug Seed W. Reseedn9 Seed Labor Equipment Tosl <br /> acres (select) es E/acres btacres $lac, $ <br /> Revegetation Maintenance 100 Oro $0.00 $100.00 $38.00 <br /> Labor $0 <br /> Equipment $0 <br /> Materials $0 <br /> Cost/Acre $0 <br /> Subtotal <br /> Notes 1)Surface area is NOT the same as footprint disturbance area typically used for permitting purposes. <br /> 2)If SRCE model,revegetimon surface area determined by area included in PER,LOM or Surety estimate <br /> Total I Vokane average VW—e <br /> vol— Requntno .—I!,Media Requm,g Labor Equlpmmt <br /> Growth Media Mamten— PlacnneM cost Replacement (assume.25%)(assume 75%) Total <br /> e <br /> cy $CY $,ac $--s $ <br /> Erosion Maintenance 3.227 5C 58J $0.00 $0.00 $0 <br /> Reclamation Monitoring <br /> Number of <br /> Description HrslDay Days/Year Years Rate <br /> $h <br /> Field Work <br /> Field Geologist/Cnyi. <br /> Ran a Scientist - $139 04 <br /> Re ortin <br /> Field Geologlst/Enginee, $151.85 $0 <br /> Range Scientist 5739.04 So <br /> Subtotal $0 <br /> Travel <br /> HrslTrip 1,i, Year Years Truck Cost <br /> h, <br /> Travel $29.28 $0 <br /> Subtotal $ <br /> Total Reclamation Monitoring 0 <br /> Notes <br /> Page 1 of 2 HOMESTAKE MINING COMPANY <br /> 94 of 164 <br />