My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-28_REVISION - M1977004 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977004
>
2019-06-28_REVISION - M1977004 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 7:52:14 AM
Creation date
7/1/2019 2:09:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977004
IBM Index Class Name
REVISION
Doc Date
6/28/2019
Doc Name
Request For Amendment To Permit
From
Homestake Mining
To
DRMS
Type & Sequence
AM1
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Homestake Mining Company June 17,2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> Project Name: Pitch Mine Reclamation Project-Reclamation Plan <br /> Date of Submittal: March 1,2019 <br /> File Name: SRCE_Version_1_4 1_016c 2019-06.06_amh_User 3 Updates.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data-USR_1_12_2019-05-14.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada <br /> Buildings&Foundation Demolition Cost Summary <br /> Labor Equipment Materials Totals <br /> Building Demolition Cost $0 $0 N/A so <br /> Wall Demolition Cost $0 so N/A Su <br /> Slab Demolition $0 $0 N/A so <br /> Subtotal Demolition $0 $0 $0 $0 <br /> Cover Placement Cost $0 $0 N/A SO <br /> Growth Media Placement Cost $0 $0 N/A $o <br /> Ripping/Scarifying Cost $0 $0 N/A SO <br /> Subtotal Earthworks $0 f0 EO $0 <br /> Revegetation Cost $0 $0 $0 $0 <br /> TOTALS $0 $0 $0 $0 <br /> Building&Foundation Demolition Costs Uses IRS Means Heavy Construction Cost Data for building and wall demolition cost calculations,Uses CAT Handbook for slab b <br /> Building Demolition V <br /> Building Total Total Total <br /> Description Footprint Slab Demohl Labor Equipment Total Building Labor <br /> I requirr"Ji (slab area) Building Volume Wall Length Wall Area Fleet 51,b'✓olumc Cost Cost Demolition Cost Cost <br /> sgft Go it ft sq ft $ 5 $ 5 <br /> $0 f0 $0 $0 <br /> Building&Foundation-Foundation Cover and Growth Media Costs <br /> Foundation Cover <br /> Total Total Growth Media <br /> D escrip•�n Fleet Number of Total Fleet Labor Equipment Growth Media Repacement <br /> �cqure"� Cover Volume Cover Repacement Fleet Productivity Trucksl Scrapers Hours Cost Cost Total Cover Cost Volume Fleet <br /> cy LCV/hr $ $ $ cy <br /> $0 $o $o <br /> Building&Foundation-Scarifying/Revegetation Costs <br /> Scarifying/Ripping Revegetation <br /> Scanfyrng/ Scarifying/ Total <br /> Scarifying) Ripping Ripping Scarifying/ Revegetation Revegetation Total <br /> D—, pti— Ripping Labor Equipment Ripping Labor Equipment Revgetation Revegetation <br /> rrquire�, Flat Area Area Long Dimension Hours Costs Cost Costs Cost Cost Material Cost Cost <br /> n hrs $ $ $ $ $ $ $ <br /> $o $o $0 $0 $0 $o $o <br /> Page 3 of 6 HOMESTAKE MINING COMPANY <br /> 68 of 164 <br />
The URL can be used to link to this page
Your browser does not support the video tag.