Laserfiche WebLink
Homestake Mining Company <br /> June 17.2019 <br /> Regular(112d)Opcabon RedamaGon Permit Application Package <br /> Project Name: Pitch Mine Reclamation Project-Reclamation Plan <br /> Date of Submittal:March 1,2019 <br /> File Name:SRCE_Version_1_4_1_016c_2019-06.06_amh_User 3 Updates.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data-USR_7_72_2019-05.14.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada <br /> ExplorraWn Roads&Pads-Cost Summary <br /> r m a <br /> qu pent s s <br /> ola <br /> Grading Costs $0 $0 WA s0 <br /> Cover Placement Cast s0 $0 WA $0 <br /> Ri n Scari in Cost s0 s0 WA $5 <br /> Subtotal Earthworks so $0 $0 <br /> Rave etation Cost $0 $0 $0 $0 <br /> TOTALS so $0 $0 $0 <br /> Exploration Roads&Pads-Regrading Costs <br /> ToW T-1 Total Total Total Total <br /> Road Ord!Pad g Fleet Recont ,-. Equipment EquUmenl Labor Equgmenr Regradng <br /> (requuedl LengM Lergm Volume Productivity Hour.��� Lost Cosl Co.t <br /> n A cy�nr Y b b <br /> 0 0 0 <br /> (1)Includes walk-in time based on cistance and travel speed(see Pmducbvlty sheet tar speeds) <br /> Exploration Roads&Pads-Growth Media Costs <br /> GroMM1 Total <br /> Medu Number at Total Total Growm <br /> �escnpnon Replacement Fkxt Trucks/ Fleet Labor Equ4ment Media <br /> pequued) Volume Fleet ProducM1vay Ecraper. Noura Laat Lost Co., <br /> cy LCymr f E E <br /> $0 $o f0 <br /> Exploration Roads&Pads-Scarify ing/Revegetation Costs <br /> Ripping Ripping Total RevegetaM1on Revegetatron Revgetatron Total <br /> Eurlace Ripping Labor Equipment Ripping Labor Equipment Materul Rev <br /> egetat,on <br /> �u sea Noah Coat. Cos C.— Oast Cos Co. coat <br /> s St $ $ Et st $ <br /> 0Sol sol0 0 0 0 <br /> ball a,,f a HOMESTAKE MINING COMPANY <br /> 43 of 164 <br />