My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-28_REVISION - M1977004 (8)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977004
>
2019-06-28_REVISION - M1977004 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2025 7:52:14 AM
Creation date
7/1/2019 2:09:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977004
IBM Index Class Name
REVISION
Doc Date
6/28/2019
Doc Name
Request For Amendment To Permit
From
Homestake Mining
To
DRMS
Type & Sequence
AM1
Email Name
DMC
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Homestake Mining Company June 17,2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> Project Name: Pitch Mine Reclamation Project-Reclamation Plan <br /> Date of Submittal: March 1,2019 <br /> File Name: SRCE Version_1_4_1_016c 2019-06-06 amh User 3 Updates.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:SRCE_Cost_data-USR_1_12_2019-05-14.xlsm <br /> Cost Estimate Type:Surety Cost Basis:Northern Nevada <br /> Exploration-Cost Summary <br /> Labor <br /> gmpment atenas oL's <br /> Hole Ahandonment Casts So SO SO SC <br /> Trench Backfilling Costs SO SO �C <br /> Subtotal Earthworks $0 $0 So $0 <br /> Trench Revegetation Costs $0 SO $0 $C <br /> TOTALS $o 0 0 0 <br /> Exploration Trenches-Calculations <br /> Exploration Trench Volume Calculation Dozing&Ripping/Scarifying Calculations <br /> Dozing:Dozing distance=112 trench length or 400 ft(max push)whichever is less <br /> Assumes flat push(grade correction factor=1) <br /> � b <br /> Revegetation: 10 ft added to trench width to account for revegetation under spoil pile <br /> •„i ::nll r,:b <br /> d <br /> Trench Volume=Trench Length.Cross Sectional Area V <br /> a <br /> Figure 1-Trench Volume <br /> Exploration Trenches-Backfill/Regrading Costs <br /> Productivity=Dozer Productivity x Grade Correction x Density Correction It Operator(0.75)x Material It Visibility x Job Efficiency(0.5) <br /> Trench Dozer Corrected Total Trench Backfill Trench 11-1ml Total <br /> �e.c ri pti on Backfill Push Equipment Dozing Density Ba,kahm. Hourly Dozer Labor Equipment Trench Backfill <br /> .rcounc•tl Volume Distance Productivity Material Correction Flee[ Productivily Hours Cost Cost Cost <br /> LCY I13CY.30%I It yd3thr yd3lhr hr $ $ $ <br /> 0 0 0 <br /> Exploration Trenches-Revegetation Costs <br /> tate of veq elanoi evyetonoi <br /> IJc�cri pti on Su riace .....-T- <br /> Labor Equipment Material Revege�aho <br /> Ireyuned'i Are Co' Coy Copt Copt <br /> SO 0 0 0 <br /> r'aae 2 of: HOMESTAKE MINING COMPANY <br /> 39 0 1C4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.