Laserfiche WebLink
Homestake Mining Company June 17 2019 <br /> Regular(112d)Operation Redamabon Permit Application Package <br /> Project Name: Pitch Mine Reclamation Project-Reclamation Plan <br /> Date of Submittal: March 1,2019 <br /> File Name:SRCE_Version_1_4_1_016c_2019-06-06_amh_User 3 Updates.:Ism <br /> Model Version:Version 1.4.1 <br /> Cast Data:User Data <br /> Cost Data File:SRCE_Cost_data-USR_1_12_2019-05-14.zlsm <br /> Cast Estimate Type:Surety Cost Basis:Northern Nevada <br /> Other Cost Items Calculated Elsewhere <br /> Total <br /> Desc�iptioii CZPllal <br /> Irequned) ID Code Facility Type Ouanldy urns Cost <br /> E <br /> 1 ETC Ea n 1 2 <br /> 2 Norm Pit-NOMvres[Pit Wall La back-Drillingand BlastingPit 1 <br /> 3 Norm Pit-Landslide Slope <br /> I Mltl alion-Clear in,and Gl"bblnl Pit 1 <br /> 4 South Pit-Landslide Slope Miti atlas_clearing and Grubbing Pit 1 <br /> 5 Sediment Pond Outlet Upgrades Ponds 1 $30 000 <br /> 6 Water Treatment Plant Demolition Water Treatment-Omer 1 $355.000 <br /> $385,000 <br /> Notes: Capital cost Is lump sum(i e.not multiplied by the quantity). <br /> Material.Labor and EqulpmenUOperabng costs are unit costs(i.e multiplied by the quantity). <br /> Page 1 of 2 HOMESTAKE MINING COMPANY <br /> 28 of 164 <br />