Laserfiche WebLink
Homestake Mining Company May 10, 2019 <br /> Regular(112d) Operation Reclamation Permit Application Package <br /> File Name: SRCE Cost data-USR 1 12 2019-05-14.) <br /> Date: 04-15-2019 <br /> Cost Basis: User Data <br /> Author/Source: D. Hrubes <br /> Monthly Rental Basis <br /> (operating hrs/ period) 160 160 <br /> Other Equipment <br /> 420D 4WD Backhoe $3,200 $3,165 <br /> 428D 4WD Backhoe $4,000 <br /> CS533E Vibratory Roller $8,470 $6,075 <br /> CS663E Vibratory Roller <br /> CP533E Sheepsfoot Compactor <br /> CP663E Sheepsfoot Compactor <br /> Light Truck - 1.5 Ton $4,074 $582 <br /> Supervisor's Truck $2,741 $582 <br /> Flatbed Truck $4,074 <br /> Air Compressor+ tools $4,345 <br /> Welding Equipment $2,123 <br /> Heavy Duty Drill Rig $58,080 <br /> Pump (plugging) Drill Rig $58,080 $24,394 <br /> Concrete Pump $18,986 <br /> Gas Engine Vibrator $554 <br /> Generator 5KW $766 $119 <br /> HDEP Welder(pipe or liner) $9,196 $9,196 <br /> 5 Ton Crane $5,610 <br /> 20 Ton Crane $12,782 <br /> 50 Ton Crane $12,782 $7,508 <br /> 120 Ton Crane <br /> Page 4 of 23 HOMESTAKE MINING COMPANY <br /> 5 of 48 <br />