Homestake Mining Company June 17,2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> HMC plans to complete the following key reclamation activities: <br /> • 2019 Construction Season: Sediment Pond Improvements; Water Treatment Plant <br /> Demolition; North Pit East Diversion Ditch; South Pit Landslide Slope Mitigation; and <br /> South Pit East Diversion Ditch. <br /> • 2020 Construction Season: North Pit and South Pit Landslide Crest Mitigation; Sandstone <br /> and Limestone Quarry reclamation; and Shop Building, Fuel Storage and Equipment <br /> inventory. <br /> • 2023 Construction Season: North Pit Northwest Pit Wall Layback, Partial Pit Backfill, <br /> French Drain and Southeast Pit Wall Buttress; and IRD Sericite Stockpile and Low Point <br /> Mitigation. <br /> • 2024 Construction Season: Haul and Access Road Mitigation; and Disposal & Repository <br /> Cell. <br /> • 2019 through 2058: Water Management O&M. Stockpiling and Material Handling. <br /> The SRCE model was developed assuming the following borrow sources: <br /> • Riprap material for the North Pit and South Pit East Diversion Channels would be <br /> borrowed from the Northwest Pit Wall Layback. <br /> • Compacted Fill for the North Pit Partial Pit Backfill and Southeast Pit Wall Buttress would <br /> be borrowed from the Northwest Pit Wall Layback. <br /> • Cover material for the North Pit Partial Pit Backfill and Southeast Pit Wall Buttress would <br /> be borrowed from the IRD Sericite Stockpile and the Landslide Crest Mitigation cover <br /> stockpile. <br /> 4.1.7. Mobilization and Demobilization. <br /> The SRCE model assumed that the mobilization and demobilization provided for the <br /> establishment of the site includes mobilization of construction equipment, labor, materials, and <br /> temporary facilities including the setting up of temporary facilities including field offices,temporary <br /> utilities and services, as well as all other related activities and administration and overhead cost <br /> relative to site establishment. <br /> Four mobilizations and demobilizations were assumed at $150,000 each, based on the <br /> construction schedule presented in Section 4.1.6 (Schedule). Costs for these were incorporated <br /> into the"Cost Summary"worksheet within the SRCE model, as part of"Earthwork/Recontouring". <br /> 4.1.8. EPCM and CQA. <br /> The SRCE model assumed that the Engineering, Procurement and Construction Management <br /> (EPCM) and Construction Quality Assurance (CQA) provided for the detailed and Issued for <br /> Construction (IFC)design and drawings, along with specifications, construction management and <br /> quality assurance required during four construction seasons. <br /> 4.2. North Pit <br /> 4.2.1. East Diversion Ditch <br /> EXHIBIT L-RULE 6.4.12 (RECLAMATION COSTS)(Revised June 17,2019) Page 7 <br /> HOMESTAKE MINING COMPANY <br />