Laserfiche WebLink
MATCHLINE(F-10B) <br /> N � , <br /> o <br /> m <br /> �r <br /> / j <br /> S. <br /> N 1,625,200 5` ♦♦ ♦ N 1,625,200[ <br /> c <br /> m <br /> wL <br /> fj 3 <br /> ` c EXTERNAL HAUL <br /> ' n <br /> P AND ACCESS ROADS m <br /> z <br /> a <br /> C. <br /> N 1.62t,400 1,624,400 xl <br /> .... m <br /> is- ". .r a I ♦ I z <br /> 00 <br /> rn <br /> I00 ♦ ��I <br /> ♦� _ ►_ �O <br /> E ` ` <br /> 1- N t,623600 <br /> cr <br /> LL ILL <br /> Q. <br /> r <br /> a ♦� <br /> I <br /> o <br /> z $ g e m <br /> U <br /> a <br /> 0 <br /> U <br /> v <br /> t <br /> U <br /> Q <br /> 0 <br /> Q <br /> o SCALE 1"=200'(22"x34"FORMAT) LEGEND: <br /> a <br /> SCALE 1"=400'(11"x17"FORMAT) OPERABLE UNITS BOUNDARY <br /> a <br /> � 200 0 200 400 800 REVISED PERMIT BOUNDARY <br /> 0 <br /> FEET <br /> g David WykOff SCALE: AS NOTED P1[C)1 Mine PROJECT: PITCH RECLAMATION PROJECT <br /> S <br /> a THIS DRAWING MAY HAVE BEEN REDUCED OR ENLARGED. PREPARER NAME: AMENDED RECLAMATION PLAN <br /> ALL FRACTIONAL SCALE NOTATIONS INDICATED ARE DATE: MAY 10,2019 <br /> ��I TITLE: EXHIBIT F-RECLAMATION PLAN MAPS <br /> h BASED ON ORIGINAL FORMAT DRAWINGS. Pa-,,a,' J DRAWN: DG HOM lii>•E OPERABLE UNIT#10-HAUL&ACCESS ROADS <br /> PREPARER SIGNATURE: <br /> `o CURRENT CONFIGURATION(SHEET 3 OF 4) <br /> NOTES: CHECKED: TM <br /> 1. SEE EXHIBIT MAP B-01 FOR GENERAL NOTES APPLICABLE TO ALL MAP,FIGURES AND DRAWINGS.PROJECT IS PART OF THE 2019 RECLAMATION DATE: 5-20-19 PERMIT No.:M-1977 004 MAP No.: <br /> APPROVED: F-10C <br /> o PLAN AND 112d-3 PERMIT APPLICATION. MH Reclamation Project <br /> iC <br />