Laserfiche WebLink
Y <br /> PRESSURE RIDGE ,.• �•` <br /> .�� <br /> d _ <br /> N 1,fi37,200 <br /> H E <br /> i <br /> _ Y tir <br /> S <br /> • <br /> RP , <br /> t <br /> At- <br /> 1TE�SION <br /> 3 <br /> � I l <br /> 1Z�7 <br /> ��� NORTH Pill t I IN <br /> z <br /> _10650 <br /> 1 <br /> 0 i <br /> r � <br /> a _ NORTH PIT LAKE 1 <br /> -NORTH PIT DAM <br /> i <br /> z <br /> G � � ` � -_ ... '. �.•+.:S�Lt Evt� :'1il L( r It aY0 "s-3 .E <br /> N,634.800 <br /> WATER MANAGEMENT )yN1,Bi4 B6 <br /> 00 <br /> s <br /> /SYSTEM <br /> LEGEND: <br /> 3 <br /> 1979 MAJOR CONTOUR <br /> o - 1979 MINOR CONTOUR <br /> ,E <br /> o x I <br /> 2018 MAJOR CONTOUR <br /> n � <br /> o /� <br /> " ', � .� � - 2018 MINOR CONTOUR <br /> a OPERABLE UNITS BOUNDARY <br /> SCALE V=200'(22"x34"FORMAT) <br /> n SCALE 1"=400'(11•'x17 FORMAT) REVISED PERMIT BOUNDARY <br /> a <br /> 2 200 0 200 400 600 UNDERGOUND MINE WORKINGS <br /> FEET <br /> 0 <br /> SCALE'. PROJECT: <br /> o David Wykoff AS NOTED P1tC M111@ PITCH RECLAMATION PROJECT <br /> a THIS DRAWING MAY HAVE BEEN REDUCED OR ENLARGED. PREPARER NAME: AMENDED RECLAMATION PLAN <br /> ALL FRACTIONAL SCALE NOTATIONS INDICATED ARE DATE: MAY 10,2019 <br /> BASED ON ORIGINAL FORMAT DRAWINGS. <br /> TITLE: EXHIBIT F-RECLAMATION PLAN MAPS <br /> PREPARER SIGNATURE: DRAWN DG no �` r1ME OPERABLE UNIT#1-NORTH PIT <br /> NOTES: CURRENT CONFIGURATION <br /> CHECKED: TM <br /> 1. SEE EXHIBIT MAP B-01 FOR GENERAL NOTES APPLICABLE TO ALL MAP,FIGURES AND DRAWINGS.PROJECT IS PART OF THE 2019 RECLAMATION PLAN AND 112d-3 PERMIT No.: MAP No.: <br /> a PERMIT APPLICATION. DATE: 5-20-19 APPROVED: ReCla ec <br /> MH mation Proj t M-1977-004 F-01A <br /> x <br />