Laserfiche WebLink
rn <br /> D <br /> A <br /> m� <br /> D <br /> c <br /> C <br /> A <br /> m <br /> Al- <br /> g <br /> 3 <br /> 3 <br /> D <br /> N - — - 10000 rn <br /> 900 <br /> m <br /> m <br /> wj <br /> l �\ <br /> / \ Z <br /> �. _ _ /• / \ 900\ m <br /> 9950 <br /> WATER MANAGEMENT T SYSTEM 000 <br /> 0 990p m a <br /> �9900 N 1 632000 �� - ""r 8 _ N 1,632,000 <br /> e`SO <br /> V <br /> E �� SAND FILTER PLANT. <br /> y <br /> V <br /> rn w y� _ <br /> �.is <br /> G _ N 1,631,600 <br /> 1,631,600 <br /> in <br /> a <br /> a <br /> a <br /> 'o <br /> `o <br /> U <br /> W <br /> LEGEND: <br /> U <br /> 0 <br /> 2018 MAJOR CONTOUR <br /> 2018 MINOR CONTOUR <br /> SCALE 1"=100'(22"x34"FORMAT) <br /> a SCALE 1"=200'(11"x17"FORMAT) OPERABLE UNITS BOUNDARY <br /> a <br /> 2 100 0 100 200 300 <br /> PERMIT BOUNDARY <br /> 0 <br /> FEET <br /> 8 <br /> a SCALE: AS NOTED Pitch Mine PROJECT: PITCH RECLAMATION PROJECT <br /> THIS DRAWING MAY HAVE BEEN REDUCED OR ENLARGED. PREPARER NAME: David Wykoff AMENDED RECLAMATION PLAN <br /> m ALL FRACTIONAL SCALE NOTATIONS INDICATED ARE DATE: MAY 10,2019 <br /> TITLE: EXHIBIT F-RECLAMATION PLAN MAPS <br /> ry BASED ON ORIGINAL FORMAT DRAWINGS. DRAWN: DG 1110M EKE OPERABLE UNIT#8-SANDSTONE UARRY <br /> S PREPARER SIGNATURE: Y��( CURRENT CONFIGURATION <br /> NOTES: CHECKED: TM <br /> 1. SEE EXHIBIT MAP B-01 FOR GENERAL NOTES APPLICABLE TO ALL MAP,FIGURES AND DRAWINGS.PROJECT IS PART OF THE 2019 RECLAMATION PLAN AND 112d-3 5-20-19 PERMIT No.: MAP No.: <br /> a_ PERMIT APPLICATION. DATE: APPROVED: MH Reclamation Project M-1977-004 F-06A <br /> ii <br />