Laserfiche WebLink
y <br /> al <br /> m3 <br /> D <br /> C <br /> C <br /> 71 <br /> m <br /> y <br /> O <br /> 0 <br /> 3 <br /> 3 <br /> 10,900, 10,900, > <br /> c <br /> 10,800' _ _ _ _ _ 10,800' N <br /> 2018 DRONE SURVEY N <br /> m <br /> 10,700, <br /> 10,700' _ a <br /> 1L_ y <br /> 5 O <br /> 10,600' __ 10,600' m <br /> m <br /> 10,500' __ __ _--10,500'9 m <br /> Z m <br /> O O z <br /> r 10,400' 10,400 i= °m <br /> w 10,300' 10,300'w <br /> 10,200' 10,200' LA <br /> m <br /> 10,100' 10,100' <br /> 10,000' 10,000, <br /> 9,900' 9,900. <br /> f 0 200 400 600 860 1000 1200 1400 1600 1800 2000 2200 2400 2600 2800 3000 3200 3400 3600 3800 4600 4100 <br /> a <br /> DISTANCE(ft) <br /> m SCALE 1"=200' CROSS SECTION F- <br /> E 200 0 200 400 600 <br /> H <br /> w <br /> o FEET <br /> m <br /> m <br /> 0 <br /> 0 <br /> a <br /> o <br /> 2 <br /> U <br /> O <br /> K <br /> U <br /> Q <br /> LL <br /> a <br /> 'o <br /> m <br /> 0 <br /> y <br /> 2 <br /> 0 <br /> U <br /> U <br /> 4 <br /> U <br /> 4 <br /> LL <br /> Q. <br /> 0 <br /> ag` SCALE: AS NOTED Pitch Mine PROJECT: PITCH RECLAMATION PROJECT <br /> THIS DRAWING MAY HAVE BEEN REDUCED OR ENLARGED. PREPARER NAME: David Vyykoff AMENDED RECLAMATION PLAN <br /> m ALL FRACTIONAL SCALE NOTATIONS INDICATED ARE DATE: MAY 10,2019 <br /> `y BASED ON ORIGINAL FORMAT DRAWINGS. L-/l TITLE: EXHIBIT F-RECLAMATION PLAN MAPS <br /> PREPARER SIGNATURE: Da.��G�/Y�i DRAWN. DG �QM ��E OPERABLE UNITSS SECTION <br /> N ROCK DUMP <br /> o CROSS SECTION <br /> m NOTES: CHECKED: TM <br /> m 1. SEE EXHIBIT MAP B-01 FOR GENERAL NOTES APPLICABLE TO ALL MAP,FIGURES AND DRAWINGS.PROJECT IS PART OF THE 2019 RECLAMATION 5-20-19 PERMIT No.: MAP No.: <br /> _Q DATE: APPROVED: Reclamation PTO)eCt M-1977-004 F-03C <br /> a_ PLAN AND 112d-3 PERMIT APPLICATION. MH <br /> ii <br />