Homestake Mining Company May 10,2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> IRD and perform field-demonstration scale testing during the 2017 field season to validate <br /> "proof of concept" bench and field pilot testing and serve as the basis for full-scale design <br /> and implementation. <br /> • Pitch Project, Permit No. M-77-004, Technical Revision (TR-9) Approval; April 18, 2018 <br /> (CDRMS, 2018a). The CDRMS approved the technical revision request to install one <br /> recirculation well in the underground mine workings, installation of up to <br /> 10 bore ho les/piezometers in the IRD and TCRD for characterization of source zones, <br /> continued field demonstration of the phosphate-based injections and installation of field <br /> implementation scaled Engineered Treatment Cell (ETC) south of the North Pit Lake. <br /> 2.4. Reclamation Summary <br /> 2.4.1. General Earthworks <br /> From 1985 to 1993, HMC initiated the process of permanently closing the Mine and performed <br /> incremental reclamation and revegetation activities for various areas. The majority of reclamation <br /> activities were performed in the 1990's, and a summary of general earthwork reclamation <br /> activities is given below: <br /> • 1991 reclamation activities (HMC, 1992). <br /> o Approximately seven acres of the Rock Quarry Site were graded, seeded,fertilized <br /> and hydromulched. <br /> o The report referenced that the low-grade ore stockpiles in the North Dump <br /> (assumed to be the IRD)and TCRD were clay capped in 1986 and 1987, and minor <br /> regrading activities were performed in 1991 to prevent pooling of water. <br /> o Geotechnical to evaluate pit wall and dump stability and piezometer monitoring to <br /> monitor phreatic conditions continued. <br /> o No additional reclaimed area was noted in 112 Annual Report form. <br /> • 1992 reclamation activities (HMC, 1993). <br /> o Approximately 50 acres of the North Dump (assumed to be the IRD) and Rock <br /> Quarry Site received a fertilizer maintenance treatment. <br /> o Approximately 7 acres of the North Dump was regraded and contoured. <br /> o Geotechnical to evaluate pit wall and dump stability and piezometer monitoring to <br /> monitor phreatic conditions continued. <br /> o Seven acres were noted as reclaimed in 112 Annual Report form, with a financial <br /> warranty of$2.263M. <br /> • 1993 reclamation activities (HMC, 1994). <br /> o A temporary low-grade ore stockpile in the North Dump was excavated and <br /> relocated to the previously reclaimed low-grade ore stockpile in the North Dump <br /> (assumed to be the IRD), and approximately 5 acres was capped, covered and <br /> revegetated. Approximately 5 acres of the lowgrade ore stockpile in the TCRD was <br /> covered and revegetated. <br /> o Approximately 10 acres of access road from the TCRD to the Mill Site was <br /> reshaped, scarified and revegetated. <br /> EXHIBIT E-RULE 6.4.5(AMENDED RECLAMATION PLAN) Page 7 <br /> HOMESTAKE MINING COMPANY <br />