Laserfiche WebLink
Homestake Mining Company May 10,2019 <br /> Regular(112d)Operation Reclamation Permit Application Package <br /> Figure 3-9. Indian Drainage Catchment 2014 water balance. .....................................31 <br /> Figure 3-10. Tie Camp Drainage 2014 water balance...................................................32 <br /> Figure 3-11. Sediment Pond Catchment 2014 water balance. ......................................33 <br /> Figure 3-12. Full Mine Basin 2014 water balance..........................................................34 <br /> Figure 3-13. 2009-2018 average surface water flow rates and uranium loads..............36 <br /> Figure 3-14. Uranium concentration at SW-33 through time. ........................................36 <br /> Figure 3-15. Location of slope failure events, mapped tension cracks and scarps at <br /> thePitch Mine............................................................................................39 <br /> Figure 3-16. Approximate location of scarps and areas of ground movement. .............46 <br /> Figure 3-17. Uncorrected profile change plot for inclinometer 198-1 for A and B axes. <br /> Inclinometer casing stick-up is approximately 3.5 ft. Zones of ground <br /> movement are shown at arrows. ...............................................................48 <br /> Figure 3-18. Uncorrected profile change plot for inclinometer 198-2 for A and B axes. <br /> Inclinometer casing stick-up is approximately 3.0 ft. Zone of ground <br /> movement are shown at arrows. ...............................................................49 <br /> Figure 3-19. Uncorrected profile change plot for inclinometer 198-3 for A and B axes. <br /> Inclinometer casing stick-up is approximately 3.0 ft. .................................50 <br /> Figure 3-20. Uncorrected profile change plot for inclinometer IN-1 for A and B axes. <br /> Inclinometer casing stick-up is approximately 4.0 ft. .................................51 <br /> Figure 3-21. Uncorrected profile change plot for inclinometer IN-2 for A and B axes. <br /> Inclinometer casing stick-up is approximately 2.5 ft. .................................52 <br /> Figure 3-22. Uncorrected profile change plot for inclinometer IN-3 for A and B axes. <br /> Inclinometer casing stick-up is approximately 3.0 ft. .................................53 <br /> EXHIBIT E-RULE 6 4.5(AMENDED RECLAMATION PLAN) Page iv <br /> HOMESTAKE MINING COMPANY <br />