Laserfiche WebLink
Case No. 09CW105 <br /> Findings of Fact, Conclusions of Law, <br /> Judgment and Decree <br /> Page 2 of 28 <br /> Users Association, and Town of Johnstown. Statements of Opposition to the amended <br /> application were filed by Central Colorado Water Conservancy District and the Ground <br /> Water Management Subdistrict of the Central Colorado Water Conservancy District and <br /> the Well Augmentation Subdistrict of the Central Colorado Water Conservancy District <br /> (Central), and the City of Evans. No other Statements of Opposition have been filed and <br /> the time for filing Statements of Opposition has expired. <br /> 3. Summary of application: The application requests approval of a plan for <br /> augmentation to offset out of priority depletions for a number of gravel pits which expose <br /> tributary ground water in the Big Thompson River basin and other uses at the sites where <br /> those pits are located together with confirmation of conditional water rights for Walters <br /> Reservoir No. 1, Walters Reservoir No. 2 and Bokelman Reservoir No. 1 and conditional <br /> ground water rights for the unlined Walters Pits and Green and Croissant Pits and a change <br /> of water rights for 3 shares of the Consolidated Hillsborough Ditch Company. The gravel <br /> pits are mined under two separate mining permits, and are known as the Walters and <br /> Bokelman Pits, and the Green and Croissant Pits. Their locations are shown on Exhibit A, <br /> attached and incorporated by reference. LRM's mining plans at the Walters and Bokelman <br /> Pits and Green and Croissant Pits include excavation of mining"cells" located at each site. <br /> As described below, gravel pits are located within"cells"at each site. <br /> 3.1 Gravel pits located in seven cells at the Walters and Bokelman Pits site are <br /> shown on the attached Exhibit B. Gravel pits located in Walters Cells 1, 2 and 3 will be <br /> inside a slurry wall that does not intercept ground water, and therefore, these gravel pits <br /> will be lined pits that will not require augmentation of evaporative depletions. Gravel pits <br /> located in Walters Cell 4 will be unlined and therefore out of priority evaporative <br /> depletions from ground water exposed in these gravel pits shall be augmented pursuant to <br /> the plan for augmentation decreed herein. Gravel pits located in Bokelman Cells 1, 2 and 3 <br /> will be inside a slurry wall that does not intercept ground water, and therefore these gravel <br /> j pits will not require augmentation of evaporative depletions. <br /> i <br /> 3.1.1 Walters Reservoir No. 1 shall be located within lined Walters Cells <br /> 1 and 2 as shown on the attached Exhibit B. <br /> 3.1.2 Walters Reservoir No. 2 shall be located within lined Walters Cell 3 <br /> as shown on the attached Exhibit B. <br /> 3.1.3 Bokelman Reservoir No. 1 shall be located within lined Bokelman <br /> Cells 1 and 2 as shown on the attached Exhibit B. <br /> 3.2 Gravel pits located in four cells at the Green and Croissant Pits site are <br /> shown on the attached Exhibit B. All gravel pits located in the four cells will be unlined <br /> and therefore out of priority evaporative depletions from ground water exposed in these <br /> gravel pits shall be augmented pursuant to the plan for augmentation decreed herein. <br />