Laserfiche WebLink
Cave No. 09CW105 <br /> Findings of'Fact, Conclusions of Law, <br /> Judgment and Decree <br /> Page 12 of 28 <br /> 11.4 Each of these points serve as an alternate point of diversion for the other <br /> and up to 50 cfs cumulative may be diverted from either or both points of diversion. <br /> 12. Source: Big Thompson River and water tributary to the reservoirs. <br /> 13. Amounts: <br /> 13.1 Walters Reservoir No. 1: 480 acre-feet(conditional). <br /> 13.2 Walters Reservoir No. 2: 160 acre-feet(conditional). <br /> 13.3 Bokelman Reservoir No. 1: 345 acre-feet(conditional). <br /> 13.4 Rate of diversion: 50 cfs. <br /> 13.5 Amounts claimed for storage at the reservoirs may include water stored <br /> within the void space in the unmined material located within the lined area at the Walters <br /> and Bokelman Pits site. Upon completion of mining at the Walters and Bokelman Pits site, <br /> LRM shall calculate the amount of total storage located within the void space of the <br /> unmined material, and provide such determination and plan to account for the storage in <br /> the void space to the Division Engineer for approval and notice to all parties of such <br /> determination and accounting plan. If no decision is rendered by the Division Engineer <br /> within 60 days of submittal,the determination shall be considered accepted by the Division <br /> Engineer. If the Division Engineer will not approve such determination and plan as <br /> provided by LRM, the Division Engineer may contest the determination and plan and file a <br /> petition to invoke the Court's retained jurisdiction within 60 days of receipt of such <br /> determination by LRM. The Court will thereafter set such proceedings as it deems <br /> necessary and LRM shall have the initial burden of proof in such proceedings concerning <br /> all issues related to the determination of the amount of total storage in the void space of the <br /> unmined material. All water released from storage in the reservoirs, include water stored <br /> in the void space located in the unmined material, shall be metered. <br /> i <br /> 13.5.1 The determination and plan to account for the storage in the void <br /> space shall include at least the following information: <br /> a. survey information and drawings of the completed reservoirs <br /> including the amount of alluvial material that remains inside <br /> the slurry- liner; <br /> b. information supporting the void space ratio (specific yield) <br /> of the remaining alluvial material; <br /> f <br /> 3 <br /> i <br />