My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-07-01_INSPECTION - M2001022
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001022
>
2019-07-01_INSPECTION - M2001022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 11:27:17 AM
Creation date
7/1/2019 1:16:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001022
IBM Index Class Name
INSPECTION
Doc Date
7/1/2019
Doc Name
Inspection Problem Corrective Action
From
Loveland Ready-Mix Concrete
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case No. 09CW105 <br /> Findings of Fact, Conclusions of Law, <br /> Judgment and Decree <br /> Page 9 of 28 <br /> AWAS alluvial aquifer model or similar tool. A copy of the reuse accounting form <br /> approved by the Division Engineer shall be provided to Central. <br /> 7.6 Loveland Ready Mix shall install and maintain measuring devices and shall <br /> keep records as directed by the Division Engineer or Water Commissioner. Loveland <br /> Ready Mix shall maintain records of its diversions and shall provide such information to <br /> the Division Engineer on such forms and at such times as reasonably requested by the <br /> Division Engineer. <br /> 7.7 Revegetation Requirements. <br /> 7.7.1 The historically irrigated land is now included within the lands <br /> covered by Loveland Ready Mix's mining permit, DRMS Permit No. M-2006-080. <br /> The mining permit contains detailed conditions requiring revegetation of disturbed <br /> lands. Loveland Ready Mix shall comply with the revegetation conditions of the <br /> mining permit. Compliance with the revegetation conditions of the mining permit <br /> as described in this paragraph 7.7.1 will meet the revegetation requirement of CRS <br /> §37-92-305(4.5)(a). Except as provided in paragraphs 7.8 or 7.10 of this decree, as <br /> each Hillsborough Share, or portion of share, is put to a Changed Use, a <br /> corresponding amount of historically irrigated acres must either be reclaimed <br /> pursuant to the following requirements (1) and(2) of LRM's DRMS Permit No. M- <br /> 2006-080 as described in this paragraph 7.7.1, or be located within a lined or <br /> unlined gravel pit. Pursuant to this decree, for the reclaimed areas located within <br /> the historically irrigated lands, LRM must satisfy the following requirements: (1) <br /> LRM is required to plant the grass seed mix as approved by DRMS in the <br /> Technical Revision Approval, Revision TR02 for LRM's Permit No. M-2006-080 <br /> on August 25, 2011; and (2) LRM is required to construct and maintain a perimeter <br /> drain for each slurry wall or lined gravel pit to maintain historical ground water <br /> levels and prevent ground water mounding in accordance with approved <br /> engineering design on file with DRMS for Permit No. M-2006-080. To the extent <br /> there is substantial conformity with the approved engineering design currently on <br /> file with DRMS and DRMS approval is obtained, LRM may revise the perimeter <br /> drain design plans to conform to any change in the configuration of gravel pits <br /> resulting from mining operations. LRM shall provide notice to Greeley and Central <br /> of any revisions to its perimeter drain design plans. LRM shall also provide notice <br /> to Greeley, Central and the Division Engineer once LRM satisfies the reclamation <br /> requirements of its DRMS permit described in requirements (1) and (2) of this <br /> paragraph 7.7.1 for reclaimed areas located within the historically irrigated lands. <br /> The perimeter drains constructed around the Walters Reservoir No. 1 and 2 comply <br /> with the above described requirements. LRM's obligations under this decree to <br /> construct and maintain a perimeter drain for each slurry wall or lined gravel pit in <br /> substantial conformity with the current design plans on file with DRMS, and to <br /> plant the grass seed mix described in this paragraph 7.7.1 shall remain terms and <br />
The URL can be used to link to this page
Your browser does not support the video tag.