My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-25_INSPECTION - C1981037 (2)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981037
>
2019-06-25_INSPECTION - C1981037 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 7:30:17 AM
Creation date
6/28/2019 7:21:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
Inspection
Doc Date
6/25/2019
Doc Name
Inspection Report
From
DRMS
To
GEC Minerals, Inc
Inspection Date
6/21/2019
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 21,2019 C-1981-037/GEC Strip Mine ZTT <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection N -Roads <br /> N -Availability of Records N -Reclamation Success <br /> N -Backfill & Grading N -Revegetation <br /> N -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish& Wildlife N - Support Facilities On-site <br /> N -Hydrologic Balance N - Signs and Markers <br /> R - Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N - Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a complete inspection of the GEC Mine conducted by Zach Trujillo of Colorado Division of <br /> Reclamation, Mining and Safety(DRMS) on June 21,2019. The GEC Mine was a surface mine which the <br /> Division has revoked the bond and terminated the permit. Therefore,no mine operator remains. All bond monies <br /> available to the Division were utilized by the Divisin for reclamation activitries and no reclamation bond money <br /> remains to conduct maintenance activities. The weather was clear and ground conditions were dry. Temperatures <br /> during the inspection were around seventy degrees fahrenheit. <br /> On November 13,2018, a meeting was held between the Division and The Corley Company in regards to the <br /> Division's intentions of releasing jursidiction to the GEC Mine Site. During this meeting,Dr. Corely,president of <br /> The Corley Company,informed the Division that it was best that the Division no longer access the site on the <br /> lands owned by The Corely Company. Based upon that meeting, this inspection was done from a limited public <br /> access point at the gated county road. The lock code that the Division once had to this gate no longer works. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The inspection for the GEC Mine was done at the locked gate along the county road to the site. From there, the <br /> Division was able to inspect the embankment of Pond A. The embankment was vegetated. While the Division <br /> could not view the top of the embankment, it has been well documented that this sediment pond is completely full <br /> of sediment. <br /> A portion of Chen's Hill was visible from this location. While it has been documented that erosion and gullies <br /> have formed on the slope of this hill, none were visible during this inspection. <br /> Number of Partial Inspection this Fiscal Year: 0 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.