Laserfiche WebLink
REVISED <br /> Note:This execution of this easement is expected before June 30, 2019.These lands have <br /> been excluded from the affected lands boundary. <br /> The parcels included in above description equal permit boundary acreage of 2,215.59 acres. Actual <br /> affected lands acreage is only approximately 1,796 acres that will be disturbed due to lands withheld <br /> from mining activities as described in Section 10's legal description and for planned buffer areas around <br /> the permit boundary. <br /> The main entrance to the mine is located at approximately 40° 14'49.00" N and 104° 12' 24.50" W, <br /> directly off Weld County Road (WCR) 91, within NE% NE%of Section 10. WCR 91 is accessed from <br /> outside the project boundary either from Hwy 34/WCR 42 to the north or Hwy 6/1-76 to the south. <br /> Approximately 2.09 miles of WCR 91 is located adjacent to the project boundary. WCR 91 and its right- <br /> of-way are located more than 200 feet outside the affected lands boundary and will not be disturbed. <br /> Hwy 6/1-76 and its right-of-way are located more than 300 feet outside the affected lands boundary and <br /> will not be disturbed by this project. Please see Section 6.4.4(e) of Exhibit D and Exhibit S Permanent <br /> Man-Made Structures for details on the location of planned mining pits adjacent to all permanent man- <br /> made structures adjacent to and within the project boundary. Mining and production activities are <br /> proposed within the affected lands boundary that creates an undeveloped minimum 200-foot buffer <br /> zone around the interior perimeter of the property boundary. <br /> 1 <br />