Laserfiche WebLink
RECEIVED <br /> TR04JUN 2 6 2019 <br /> DIVISION OF RECLAMATION <br /> RPM,Inc. TC1\mac MINING AND SAFETY <br /> �� 33 <br /> 'oa N <br /> COLORADO DIVISION OF RECLAMATION 1UP AI�TD SAFETY <br /> \` 1313 Sherman Street.Room 215_Denver.Colorado 80203 ph(303)866-3567 b <br /> O <br /> N <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> File No.:M- 2001-005 Site Name:Grisenti Farms Gravel Pit <br /> County Fremont TR* rDkIfS Use on/0 <br /> 16 Permittee:Continental Materials Corporation <br /> 4 Castle Concrete Co.., dba Castle Aggregate <br /> Operator(If Other than Permittee): <br /> Pelmittee Representative:FIB Humphries, Regulatory Permit Management, Inc_.(303)854-7499 <br /> Please provide a brief description of the proposed revision: <br /> 0 <br /> Request to install a small island in Pond 2,to enhance wildlife habitat. I� <br /> 3= 0 <br /> As defined by the Minerals Rules.a Technical Revision(TR)is: -a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Enviromnental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR. <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee.the Division will <br /> determine if it is approvable xiithin 30 days.If the Division requires additional information to approve a <br /> TR.you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies.the Division must deny the TR runless the <br /> permittee requests additional time.in vvritin_.to provide the required information. <br /> There is no pre-defuled format for the submittal of a TR.however.it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated alining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and subunit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted(mark only one) <br /> 110c. I11. 112 coustnution <br /> materials.and 112 quarries S216 'D <br /> 112 hard rock(not DMO) S 175 ❑ <br /> 110d. 112d(1.2 or 3) $1006 ❑ <br /> RPNI,Inc.,25049 E.Alder Dr.,Aurora,CO 80016 Phone:(303)854-74" Email:hlhumphries24t?comeast.net <br />