My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-26_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2019-06-26_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2024 10:53:10 AM
Creation date
6/26/2019 1:30:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
6/26/2019
Doc Name
Request for Technical Revision
From
Continemtal Materials Corp.
To
DRMS
Type & Sequence
TR5
Email Name
JPL
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rf mzkr^ Qly <br /> COLORADO DIVISION OF RECLA_-MATIO\, MI1I:tiG AND SAFETY <br /> '�878 1313 Sherman Street.Room 215,Denver.Colorado $0203 ph(303)86&3567 <br /> REQUEST FOR TECHNICAL REVISIOti(TR)COVER SHEET <br /> File No.: M- 1986-015 site Name:Pueblo East Gravel Pit <br /> Couurty Pueblo TR= (DRMS Use only) <br /> Pernrittee:Continental Materials Corporation <br /> Operator(If other than Pennittee):Transit Mix Concrete Co. <br /> Perrrittee Representative:H.B. Humphries, Regulatory Permits Management, Inc. <br /> Phone- 303-854-7499,Email:hlhumphnes2racomcast.net <br /> Please provide a brief description of the proposed revision: <br /> Request to revise the Ground Water Level Monitoring Program. <br /> As defined by the Minerals Rules.a Technical Revision JR)is: "a change in the permit or application <br /> which does not have more than a nunor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division detennures that the proposed revision is beyond the scope of a TR. <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the penult. <br /> The request for a TR is not considered '-filed for review"uurtil the appropriate fee is received by the <br /> Division(as listed below by peruit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee.the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional urfornration to approve a <br /> TR.you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies. the Division must deny the TR unless the <br /> pernuttee requests additional time.in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR:however. it is up to the penrrittee to provide <br /> sufficient information to the Division to approve the TR request. including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Time Required TR Fee Submitted(mark only one) <br /> 110c. 111. 112 construction ❑ <br /> materials. and 112 quarries S216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d. 112d(1. 2 or 3) $1006 ❑ <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.