Laserfiche WebLink
GCC <br /> GCC Energy, LLC <br /> Telephone: 970.385.4528 6473 County Road 120 <br /> Energy "Safety as a Value" Facsimile: 970.385.4638 Hesperus, CO 81326 <br /> provided for the current haul road that will connect to the new road. Please provide a <br /> profile for the entirety of the haul road on Map King I-007B and update Map King I-007 <br /> showing the corresponding transect. <br /> GCCE June 25, 2019: A profile for the current haul road has been added to Map King I-007B <br /> and Map King I-007 has been revised to show the corresponding transect. <br /> 16.On Map King I-007 there is a series of stations that begin near the West Pond and extend <br /> southward, up gradient. It is unclear which ditch these stations are associated with. <br /> Please edit the map or explain the purpose of these stations. <br /> GCCE June 25, 2019: The stations indicated on Map King 1-007 are the new haul road stations. <br /> Because the new treated water ditch(Reach 10) and the new clear water ditch(Reach 6)parallel <br /> the road for a good portion of the alignment,the stations were also used to reference ditch <br /> sections. The stations have been removed from the treated water SEDCAD model to avoid <br /> confusion. <br /> 17.Map King I-007C includes N-S and E-W sections. The locations of these sections should <br /> be shown on a plan view (perhaps one of the other maps). <br /> GCCE June 25, 2019: Map King I-007 has been updated to show the location of the N-S and E- <br /> W sections. <br /> 18.The revision history for the Final Contour Map (Map King I-011) is confusing. Per Division <br /> records, the most recent approved version was August 2016, resulting from TR-24. <br /> However, the map in the TR-27 submittal has RN-07 from 2017 listed in the revision <br /> history. Please explain if this is an error or not. <br /> GCCE June 25, 2019: Map King 1-011 has been revised to show the correct revision history of <br /> the map. <br /> 19.On Map King I-011, the ditch along the north side of the new road dead ends. Please <br /> revise this map or explain why it dead ends. <br /> GCCE June 25,2019: On Map King I-011,the ditch along the north side of the proposed new <br /> road has been revised to show its anticipated location. <br /> Please find enclosed 2 copies each of: <br /> • King I PAP Cover Page (TR-27 PAR #1) <br /> • King II Table of Contents page iii <br /> • King II Section 2.05.4 page 11 <br /> • Appendix 11(1 B) SedCad Modeling Results <br /> • Map King I-007 (TR-27) Operation Plan 8v Surface Features <br /> • Map King I-007B (TR-27), Road Design Detail <br /> • Map King I-007C (TR-27), Cross Section Views — Lower Refuse Pile <br />