Laserfiche WebLink
J&T Consulting, Inc. Prowers Aggregate Operators LLC <br /> West Farts Pit <br /> 6/12f2019 <br /> FRecln Bond Quantities and Costs <br /> CeumdUna.Inc. <br /> Summary of Reclamation Bond Costs <br /> Rec amation Operation Quantity Unit Unit Cost Costi <br /> Amendment 01 Bond Costs <br /> DRMS Calculated Bond 1 Is $1,849,793 $1,849,793 <br /> Items Added in Technical Revision 5 <br /> Removal of Concrete Conveyor Support Pads 1.00 Is $25,000 $25,000 <br /> Removal of CMP Culvert and Backfilling with Pit Run Material 1.00 Is $15 000 $15 000 <br /> Total Direct Cost $40,000 <br /> Overhead and Profit Cost(13.07%) $5,228 <br /> Contract Cost $45,228 <br /> Project Management(7.00%) $2,800 <br /> Additional Warranty Required For Technical Revision 5 Items $48,028 <br /> Total Financial Warranty Required For All Phases $1,897,821 <br /> 1 of 1 <br />