My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-19_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2019-06-19_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:52:59 AM
Creation date
6/20/2019 11:30:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
6/19/2019
Doc Name
Adequacy Review Response
From
CC&V
To
DRMS
Type & Sequence
TR113
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEWMONT <br /> GOLDCORP.. <br /> The proposed study is expected to be complete in two years, although the <br /> need for additional studies may be identified beyond this timeframe. The study <br /> cell will be reclaimed prior to CC&V closure so as to not impact reclamation of <br /> VLF 1. Expected criterion for completing reclamation is study completion. <br /> 7) Financial Warranty: The narrative on page 2 briefly outlines a reclamation plan <br /> for the leach cell of the purpose of estimating reclamation liability. As there is not <br /> a section in this TR request specifically addressing reclamation for this leach cell, <br /> comments related to reclamation are included under this section. The DRMS <br /> intends to perform its own reclamation liability estimate for the leach cell. As <br /> such, we require the following additional information: <br /> a. How will the liner be dealt with in the reclamation plan? Please be aware <br /> the DRMS will not allow it to be left in place as it would preclude rinsing of <br /> the VLF below it as currently approved in the site reclamation plan. Also <br /> indicate the haul distance for disposing the liner. <br /> b. The DRMS requires a typical haul distance for material to be moved in <br /> order to estimate earth moving costs. Please indicate where the stacked <br /> ore and previously processed crushed ore is expected to be hauled in <br /> order for the DRMS to estimate number of trucks, haul distance and <br /> grade. <br /> The liner will be ripped and loaded into a haul truck to be relocated on VLF 1 <br /> for continued processing. The expected haul route and approximate distance <br /> (1,126 feet) are detailed in Figure 5. <br /> 8) Figure 2: The dimensions on Figure 2 indicate the cell is 210 feet by 348 feet <br /> (73,080 sgft., assuming a rectangle). Figure 2 also indicates the area is 67,049 <br /> sgft., a near 10 percent difference. The DRMS acknowledges the cell is not a <br /> perfect rectangle, but requests confirmation the cell area is 67,049 sgft. <br /> The cell area is approximately 67,049 square feet. This is an estimated <br /> dimension calculated from the surface length and width from which an <br /> approximate outside berm width was subtracted. <br /> Should you require further information, please do not hesitate to contact Katie Blake via <br /> phone or email at 719.689.4048 and Katie.Blake(aD-newmont.com, or me at <br /> 719.689.4042 and Justin.Raglin(cD-newmont.com. <br />
The URL can be used to link to this page
Your browser does not support the video tag.