My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-18_INSPECTION - C1980007
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1980007
>
2019-06-18_INSPECTION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2019 7:44:09 AM
Creation date
6/19/2019 9:45:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Inspection
Doc Date
6/18/2019
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
6/4/2019
Email Name
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conclusion <br />Survey monuments should be installed on parcels 11LWE6X53 and sites E5-13. Sites E5-11 and <br />E6-13 do not meet the requirements for bond release as they have not been reclaimed. Otherwise, <br />the Phase I and Phase III reclamation evaluated under SL-11 and SL-12 comports with the <br />approved West Elk Mine reclamation plan and supports the wildlife habitat and rangeland <br />PMLU. No enforcement actions were taken as a result of this inspection, nor are any pending. <br /> <br />Photos→ <br /> <br /> <br /> Figure 1. Typical Phase I reclamation at parcel E6-6. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.