Laserfiche WebLink
Division of Reclamation Mining&Safety <br /> Permit Application <br /> EXHIBIT D <br /> 6.3.4 (1) (a) <br /> • When seeding occurs in September <br /> • N/A no overburden only reclamation <br /> 6.3.4 (1) (b) <br /> • All slopes graded to a 3:1 or flatter or to match the existing conditions and or as deemed stable by <br /> the Geotechnical engineer <br /> • A Geotechnical Engineer review of all operators slopes has determined that slopes are stable and <br /> meet performance standards as defined in 3.1, posing no stability issues or exposures to any <br /> permanent roan-made structures. <br /> 6.3.4 (1) (c) <br /> • Scarify with excavator <br /> • Seeding will be placed during germination times as per CDOT standard specifications with a <br /> County standard seed mix(Attached) for native growth, Straw waddles will be placed in the <br /> North West Ditch of the property. Natural ditch existing with no existing drainage control or <br /> vegetation present <br /> 6.3.4 (1) (c) (i) <br /> • No topsoil to be replaced <br /> 6.3.4 (1) (c) (ii) <br /> • Seeding will occur in September <br /> • Ground will be scarified to receive seed and tack coated <br /> • Seed mix attached <br /> 6.3.4 (1) (c) (iii) <br /> • Seed mix and quantities in mix design attached <br /> 6.3.4 (1) (c) (iv) <br /> • Hydroseed <br /> 6.3.4 (1) (c) (v) <br /> • Mulch will not be used <br /> • 150 lbs/acre of Plantago type tackifier will be utilized <br /> 6.3.4 (1) (c) (vi) <br /> • None <br /> 6.3.4 (1) (d) <br /> • All ponds, streams, roads and buildings, if any, will remain in the same condition as they were <br /> pre-mining, after reclamation is complete <br /> • existing roads and turn areas stay <br /> 12 DuCray Property-2018 <br />