Laserfiche WebLink
COC-588O8 <br /> Exhibit 8 <br /> page 2 Of 2 <br /> Standard Stipulations <br /> S' The bolder shall be fully liable to the United States for any damage or <br /> injury incurred by the United States in connection with the use and <br /> occupancy of the right-of-way area by the holder, its employees, <br /> concraccors, or e:-,pIoyees of chla co�cz,aotors. <br /> ' . The holder shall be fully liable �Zor injuries or damages to third <br /> parties resulting from holder's activities or facilities on lands under <br /> Federal jurisdiction in which the damage or injury occurred. The <br /> bDlder shall fully indemnify the United States liability, damage or <br /> claims arising in connection with the holder's use and occupancy of the <br /> right-of-way area. <br /> 7. In the construction, operation, maintenance and termination of the <br /> facilities authorized by this grant, the holder shall not discriminate <br /> against any employee or applicant for employment because of race, <br /> creed, color, sex or national origin. All subcontracts shall include <br /> an identical provision. <br /> R. 180 days prior to termination of the right-of-way, the bolder shall <br /> contact the authorized officer to arrange a joint inspection of the <br /> right-of-way. This inspection will be baId to agree to an <br /> acceptable termination (and rehabilitation) plan. This plan shall <br /> include but is not limited to, removal of facilities, re000touriog, <br /> or seeding. The authorized officer must approve the plan in <br /> writing prior to the holder's commencement of any termination <br /> activities. <br />