6400
<br /> 13H-1 Injection Well Drilling and Completion Information
<br /> All Depths Measured from Kelly Bushing (KB) _P&A
<br /> Perforate 7.625"Casio 6300
<br /> 400'
<br /> 0.0'-121.0' MD KB: drilled 26.0" diameter conductor hole o rate 7.625 Casing
<br /> 500
<br /> 0.0'-121.0' MD KB: installed 13.375" OD conductor casing (J-55, 54.5 lb/ft), cemented to surface
<br /> s200
<br /> 121.0'-1464.0' MD KB: drilled 9.875" diameter vertical intermediate hole to KOP (1464.0' MD KB) 600
<br /> 6100
<br /> 1464.0'-2325.0' MD KB: directional drilled 9.875" diameter curve portion intermediate hole, average 110 per 100 ft KB:6726.1'
<br /> GL:6715.1' 700
<br /> 0.0'-2324.0' MD KB: installed 7.625" OD intermediate casing (K-55, 26.4 lb/ft), centralizers every 80-100 ft. 6000
<br /> 0.0'-2325.0' MD KB: cemented intermediate casing, 500 sks ElastiCem lead and 80 sks Varicem tail
<br /> 800
<br /> 1412.0'-1420.0' MD KB: set bridge plug at 1420' MD KB and perforated intermediate casing at 1412 and 1413' MD KB, Aug. 10, 2013 5900
<br /> 0.0'-1420.0' MD KB: remedial cement squeeze jobs, 3 total, 8/12/2013 900
<br /> P&A 5800
<br /> 2325.0'-4318.0' MD KB: directional drilled 6.75" diameter horizontal hole (TD) Cement Plug
<br /> Surface to 2121.0 MD GL
<br /> 1828.0'-2544.0' MD KB: installed 5.5" OD casing (L-80, 17 lb/ft); 5.5" liner hanger set at 1828.0' MD KB total of615.62wthhigh arlyacceler n and fiber loo0 5700
<br /> 0-43'(8.86 sacks;0.422 cu yds)
<br /> 2544.0'-3835.0' MD KB: installed 5.5" OD casing (J-55, 17 lb/ft) 43'-616'(6.5 sacks; 136.5 cu yds)
<br /> 616'-1326'(7.5 sacks;157.5 cu yds)
<br /> 1326'-1661'(105 sacks;5 cu yds) 1100
<br /> 3835.0'-4254.0' MD KB: installed 5.5" OD casing (L-80, 17 lb/ft) 1661'-2060'(105 sacks;5cuyds) 5600
<br /> 2060'-2121'(105 sacks;5 cu yds)
<br /> 2015 Remedial Work
<br /> 1200
<br /> 1856.0' MD KB: Oct. 6, 2015: chemically cut 5.5" liner; original and 1st remedial liner hangers removed on Oct. 7, 2015 811012013,Perforate Casing 5500
<br /> 1412'and 1413'
<br /> 1858.2' MD KB: Oct. 9, 2015: chemically cut 5.5" liner; prep liner for remedial patch four 0.5"holes,90°phase 1300
<br /> S400
<br /> 1800.2'-1815.8' MD KB: Oct. 14, 2015: installed remedial HHP Hydro Liner Hanger, KLX TIW 7 5/8" x 5 1/2" 8/12/13,13,CBLRunAft Squeeze After Jobs,
<br /> &total
<br /> 8/13/13,CBL Run After Squeeze#1
<br /> 1400
<br /> 1815.8'-1857.0' MD KB: Oct 14, 2015: installed 5.5" OD J-55 LTC casing joint Kick-Off Point 5300
<br /> 1464.0 MD KB
<br /> 1857.0'-1859.0' MD KB: Oct 14, 2015: installed Logan 5 1/2" 7k overshot casing patch 9.875"Directional Wellbore ,Soo�P00'a'e'625'Casing
<br /> 1500
<br /> 0-2325.0 MD KB
<br /> 1396.7'-1417.0' MD KB: Oct 20, 2015: set Weatherford/Homco Patch. MIT successfully performed. 2015 REMEDIAL WORK —Perfrforate7.625"Casing 5200
<br /> Oct.6,2015: chemically cut 5.5"liner at 1856.0 MD KB 1525'
<br /> Plug and Abandon Oct.7,2015: original and 1st remedial liner hangers removed P norate 7.625"casing
<br /> Oct.9,2015: chemically cut 5.5"liner;prep liner for remedial patch 1600 1570'
<br /> Oct 20,2015: installed remedial HHP Hydro Liner Hanger,1800.2-1815.8 MD KB 5100
<br /> 2092.0' MD GL: perforate 5.5" liner @ 2092', 1950', 1 820' installed 5.5"OD,J-55 LTC casing joint,1815.8-1857.0 MD KB
<br /> installed Logan 5 112"7k overshot casing patch,1857.0-1859.0 MD KB
<br /> Oct.20,2015: MIT successfully performed
<br /> 1570.0 MD GL: perforate 7.625" casing @ 1570', 1525', 1500', 460', 400' 6.75"Directional Hole ''o0 Measured Depth GL 5000
<br /> 2325.04318.0 MD KB Initial 5.5"Liner Hanger(removed)
<br /> MD GL: set Cast Iron Bridge Plug (CIBP) 13H-I/13H-R Pass-by 1828.0 MD KB
<br /> 7.625"OD Casing(K-55,26.4 lb/ft)2645.0 MD KB(13H-I) 'eoo
<br /> 0.0'-2121.0' MD GL: cement plug to surface 2559.0 MD KB(13H-R) 0-2324.0 MD KB 4900
<br /> P&A
<br /> 7.625"Casing Shoe 8 forate 5.5"Liner
<br /> 5.5"OD Casing(J55&L80,17 lb/ft)
<br /> TD:4318.0 MD KB 1828.0-4254.0 MD KB 2324.0 MD KB ement to Surface
<br /> As Built Drill Path Pao 0.0-2121.0 MD GL 4800
<br /> Perforate 5.5"Liner
<br /> 1950, Dissolution Surface
<br /> p p 8 epp p p p > Perforate 5.5"Liner 4700
<br /> 2092'
<br /> 8 8 8 8 8 8 Cast Iron Bridge Plug
<br /> 2121.0 MD GL
<br /> 4600
<br /> West East Elevation,ft
<br /> Natural Soda LLC
<br /> 13H-1 As-Built Well Completion - P&A
<br /> Section 25, T1S, R98W Rio Blanco County, CO
<br /> Daub&Associates,Inc., ..- Date: June 6,2019
<br />
|