My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-14_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2019-06-14_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 7:13:04 AM
Creation date
6/14/2019 1:00:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
6/14/2019
Doc Name
Water Level Monitoring
From
Battle Mountain
To
DRMS
Annual Report Year
2019
Report Quarter_Month
May
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2-Monthly Piezometer Elevations <br /> Monitoring Well Obserati Piezometer Depth Depth to Water Depth of Water <br /> Identification von Date ft 11 ft <br /> P6 05/30/2019 72.46 DRY N/A <br /> P7 05/30/2019 92.50 92.29 0.21 <br /> P8 05/30/2019 97.51 96.67 0.84 <br /> P9 05/30/2019 72.30 71.88 0.42 <br /> 1310 05/30/2019 58.30 57.57 0.73 <br /> I'll 05/30/2019 41.80 41.39 0.41 <br /> P12 05/30/2019 41.71 41.67 0.04 <br /> P13 05/30/2019 41.34 41.02 0.32 <br /> P14 05/30/2019 41.24 DRY N/A <br /> P15 1 05/30/2019 41.10 1 40.86 1 0.24 <br /> The'leak detection system at the TSF Collection Pond was inspected May 30,2019. A total of 730 gallons <br /> (24.3 GPD) were evacuated from the leak detection system and pumped to the LTF. The LTF underdrain <br /> system flow was measured to be approximately 34.0 gallons per minute (gpm). <br /> West Pit Waste Water Treatment Plant <br /> During the month of May 2019, the West Pit Water Treatment Plant was operated under Colorado <br /> Department of Public Health and Environment(CDPRE)CDPS Permit No. C00045675 for discharge into <br /> the Rito Seco alluvial aquifer. During the month of May, 8,883,600 gallons (27.26 acre-feet) of treated <br /> water was discharged to the Rito Seco and 500,400 gallons (1.54 acre-feet) of water transferred from the <br /> West Pit to the LTF. There was no sludge transferred from the water treatment plant drying pad to the LTF. <br /> BMRI performed the monthly visual seepage expression inspections on May 30, 2019 in the historic <br /> seepage area identified in Figure 2 of the permit. No seepage expressions were observed in the historic <br /> seepage area during May 2019. <br /> BMRI measured the monthly West Pit backfill, alluvial and monitoring wells as required under in the <br /> QA/QC Plan. Measurements obtained for the monthly wells are shown in Table 3. <br /> Table 3-Monthly and Quarterly Groundwater Depth to Water <br /> Monitoring Well Identification Observation Date Depth to Water <br /> ft <br /> BF-4 05/30/2019 24.90 <br /> BF-511 05/30/2019 30.82 <br /> BF-6 05/30/2019 30.89 <br /> M-6 05/30/2019 DRY <br /> M-7 05/30/2019 DRY <br /> M-8 05/30/2019 DRY <br /> M-9 05/30/2019 141.44 <br /> M-10 05/30/2019 25.05 <br /> M-11R 05/30/2019 39.65 <br /> M-12 05/30/2019 174.82 <br /> M-13R 05/30/2019 125.95 <br /> M-14 05/30/2019 130.89 <br /> M-15 05/30/2019 90.77 <br /> M-16 05/30/2019 21.28 <br /> M-17 05/30/2019 29.63 <br /> M-18 05/30/2019 25.37 <br /> M-19 05/30/2019 22.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.