Laserfiche WebLink
in the Permit <br />System <br />TR113 Liability <br />(2013 Ann Rept) $27,401,821.54 $0.00 $27,401,821.54 <br />MR220 Dist Acres 10/6/2014 <br />3136.20 <br />(should have been <br />3347.71) <br />+2.30 <br />3138.50 <br />(should have been <br />3350.01) <br />MR220 Liability $27,401,821.54 +$5251.00 $27,407,072.54 <br />MR221 Dist Acres 12/12/2014 <br />3138.50 <br />(should have been <br />3350.01) <br />0.00 <br />3138.50 <br />(should have been <br />3350.01) <br />MR221 Liability $27,407,072.54 $0.00 $27,407,072.54 <br />SL16 Dist Acres <br />(Phase II) <br />3138.50 <br />(should have been <br />3350.01) <br />0.00 <br />3138.50 <br />(should have been <br />3350.01) <br />SL16 Liability <br />(Phase II) $27,407,072.54 -$376,228.82 $27,030,843.72 <br />It was at this <br />point when an <br />adjustment of <br />+190.20 acres of <br />new Disturbed <br />Acreage was <br />incorrectly <br />entered into the <br />Permit System, to <br />account for <br />190.20 acres of <br />new on-the- <br />ground <br />disturbance <br />reported in the <br />2013 ARR <br />(TR113). <br /> - Dist Acres <br />Date <br />Unknown <br />3138.50 <br />(should have been <br />3350.01) <br />+190.20 <br />(these acres <br />shouldn’t have <br />been added to the <br />Permit System) <br />3328.70 <br />(these 190.20 acres <br />didn’t actually have <br />to be entered in the <br />Permit System, so <br />this number still <br />should have been <br />3350.01) <br />- Liability $27,030,843.72 $0.00 $27,030,843.72 <br />TR114 Dist Acres <br />(2014 Ann Rept) 5/11/2015 <br />3328.70 <br />(should have been <br />3350.01) <br />0.00 <br />3328.70 <br />(should have been <br />3350.01) <br />TR114 Liability <br />(2014 Ann Rept) $27,030,843.72 $0.00 $27,030,843.72