Laserfiche WebLink
MR215 Liability <br />(Mid-Term <br />Review Response) <br />(Revised Prop <br />Dec Form; <br />Signed 12/1/10) <br />(2nd Revised Prop <br />Dec Form; <br />Signed 2/23/11) <br />$30,173,724.00 <br />$30,173,724.00 <br />(the value of <br />$30,173,724.00 <br />inadvertently <br />included the <br />$898,333.00 <br />released by SL9) <br />$0.00 <br />-$896,768.00 <br />(this number was <br />not an attempt to <br />subtract the <br />$898,333.00 <br />released by SL9 <br />that was <br />inadvertently <br />added back by the <br />2nd Revised <br />Proposed Decision <br />Form for PR6; the <br />$896,768 value was <br />just the difference <br />between the <br />$30,173,724.00 in <br />the Permit System <br />and the revised <br />Mid-Term Review <br />site-wide cost <br />estimate amount of <br />$29,276,956.00) <br />(a new amount of <br />$1,376,027.00 was <br />subtracted from <br />the $30,173,724.00 <br />value, due to DRMS <br />revising for a 2nd <br />time its Mid-Term <br />Review site-wide <br />cost estimate, to <br />$28,797,697.00) <br />$30,173,724.00 <br />$29,276,956.00 <br />(In a memo dated <br />10/22/10, DRMS <br />revised its Mid- <br />Term Review site- <br />wide cost estimate <br />of $31,127,989.00 <br />down to <br />$29,276,956.00; <br />this number of <br />$29,276,956.00 did <br />not include the <br />$898,883 that was <br />included in the <br />$30,173,724.00 <br />number). <br />$28,797,697.00 <br />(In a memo dated <br />2/17/11, DRMS <br />revised for a 2nd <br />time, its Mid-Term <br />Review site-wide <br />cost estimate, from <br />$29,276,956.00 to <br />$28,797,697.00; <br />this number of <br />$28,797,697.00 did <br />not include the <br />$898,883 that was <br />included in the <br />$30,173,724.00 <br />number). <br />SL11 Dist Acres <br />(Phase I) <br />(Revised Prop <br />Dec Form; <br />Signed 2/23/11) <br />1/7/2011 <br />(2/23/2011) <br />3670.01 <br />3670.01 <br />0.00 <br />0.00 <br />3670.01 <br />3670.01